New refinery start up

Home Forums Galveston2013-hall Refinery News New refinery start up

Viewing 1 reply thread
  • Author
    Posts
    • #2353
      Freddy Martinez
      Participant

      How can I start up a new refinery ? If I have a Destilation and vaccum unit, DCU, HCC, Diesel Hydrotreater and so on. What is it the logical procedure to start up the units on the On Site ? I mean. First I beginning to start up the destilation unit or Diesel Hydrotreater ? Anybody knows any paper about that ?

    • #5211
      Charles Randall
      Participant

      I am afraid sir that if you dont know this basic step then you dont have any business trying to start up a new refinery. Anyone expecting to operate a new Grassroots should have been going thru a year long process of simulation on virtual units in a training trailer for that purpose given by an ex-operator who makes military drill seargents look like girl scouts.

      This is not an OJT program – refineries are far too complicated and dangerous for anyone trying to do it using training wheels.

Viewing 1 reply thread
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum