      US Refinery Status: Conoco’s Ponca City Refinery In Turnaroun
      DOW JONES NEWSWIRES October 16, 2009

      The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn’t purport to be a comprehensive list.
      ConocoPhillips (COP) said Thursday that its 198,400-barrel-a-day refinery in Ponca City, Okla., is undergoing planned maintenance.
      Flint Hills Resources said Thursday that it plans to shut Sat Gas Unit No. 1 at the west plant of its Corpus Christi, Texas, refinery for “needed maintenance activities.”

      Operator Refinery Capacity Description Restart
      (in 000s
      bbl/day)
      UNPLANNEDCANADA

      Suncor Alberta One of two oil sands up- n/a
      graders is operating at re-
      duced rates following a
      minor fire on Oct 12.

      Suncor Sarnia 85.0 Hydrocracker unit shut Oct n/a
      Ontario 11 due to fire at associated
      compressor; no restart esti-
      mate available.


      EAST COAST

      Conoco Linden, NJ 238.0 Officials consider run cuts n/a
      due to slack demand, a per-
      son familiar with operations
      said on July 17.

      CARIBBEAN

      GULF COAST

      BP Texas City 455.8 Aromatics Recovery Unit in A Oct 14
      TX side of plante restarted on
      Oct 14.
      Leak discovered Oct 10 at heat n/a
      exchanger at FCCU3 which was in
      propane/propylene service at
      the time. Impact on production
      unclear.

      Citgo Corpus 163.0 Alkylation unit shut July 19 end-Oct
      Christi, TX by near-fatal explosion to
      return to service by end-Oct.
      The restart was delayed from
      early-Oct due to safety issues.
      FCCU No. 1 and 2 experience snag
      when the regenerator temperature
      dropped; lasted 18 minutes Oct. 8.

      Delek Tyler, Tx 60.0 FCCU in restart Oct 14; unit taken Oct 14
      taken out of service Oct 13 due to
      unexpected operational changes.

      Exxon Baytown 572.5 Hydrocracker Unit 1 up and running Oct 12
      TX the Co. said on Oct 12. The unit was
      shut on Oct 9 to facilitate compres-
      sor repairs; associated units ran at
      reduced rates during the repair time.

      Motiva Norco 236.4 Reformer back at planned rates Oct 12
      LA Oct 12 after shutting down Oct 7
      for compressor repairs.

      Valero Corpus 142.0 West Plant Hydrocracker unit n/a
      Tx shut Oct. 7 due to small,
      brief fire. No restart esti-
      mate. An SMR unit was shut
      for maintenance after the
      fire; restart Oct. 10.
      Restarting East Plant’s Tank 79
      on Oct. 9.

      Total Port Arthur 232.0 A fire occurred in a heavy oil n/a
      TX line between the crude unit and
      the tank farm on Oct 13 during
      the restart of several process
      units that were knocked off-line
      earlier that day by a power snag.
      The impact of the fire on opera-
      tions is unclear.
      Powerstation cogen turbine
      reduced to its “lowest
      firing rate” Oct. 8 due to
      leaky exchanger; nitrogen
      oxide steam taken out of
      service.

      MIDWEST

      ROCKY MOUNTAINS

      WEST COAST

      Chevron El Segundo 274.0 A brief period of flaring n/a
      CA on Oct 14 is reported to
      state regulators. Filing
      lists cause as “breakdown.”

      Exxon Torrance, CA 149.5 Restarted two unnamed units Oct 6
      Oct. 6 that were
      unexpectedly shut Oct. 3.

      Tesoro Wilmington 96.8 Refinery returning to normal Oct 14
      CA operations Oct 14 after power
      snag upsets several process
      units.
      Expects to restart coking Mid-Oct
      unit at full rates mid-Oct
      that was shut due to a fire
      Sept. 25.

      PLANNEDCANADA

      CARIBBEAN

      Valero Aruba 235.0 The refinery that was shut
      in June for 2-3 months for
      economic reasons is being
      closed indefinitely.

      EAST COAST

      Sunoco Westville, NJ 145.0 Idling all refining Mid-Nov
      operations indefinitely due
      to poor economics, Co. said
      Oct. 6. It will take 4-6
      weeks to work through crude
      stocks to shut down.

      Sunoco Philadelphia, 340.0 FCCU at Girard Point in re- Sep 14
      PA start Sep 14 following about
      five weeks of turnaround
      maintenance.

      Reformer unit shut in Girard n/a
      Point section in early Oct
      for economic reasons. Shutdown
      to last 1-6 months.

      Valero Delaware City 210.0 Coker Unit shut Oct 3-4 and n/a
      DE related gasifier unit to shut
      within a few days for economic
      reasons.
      Maintenance at 80,000-b/d
      FCCU delayed to Nov./Dec.

      Western Yorktown 64.5 Planned work scheduled 1Q 2010.
      Va.

      GULF COAST

      Conoco Borger, TX 146.0 Unidentified units shut for
      planned turnaround, Co. said
      Oct. 9. No further details.
      Shut amine unit for planned Oct. 24
      maintenance Oct. 9-24.

      Total Port Arthur,TX 232.0 Shut unit 821 for maintenance Oct. 13
      from Oct. 9-13.

      Alon Krotz Springs 80.0 Plantwide turnaround starts Jan.
      LA. Jan. 1 to last 21 days. 21/22

      BP Texas City, TX 467.0 Ultraformer No. 4, Ultra- Early
      cracker unit and Aromatics Oct.
      recovery unit shut for planned
      seasonal turnaround mainte-
      nance starting on Sept. 2;
      restart seen in 4-5 weeks.
      Shut Power Station No. 4 Oct. 14
      Boiler, B-430 for planned
      work starting Oct. 7.

      Chevron Pascagoula, 330.0 Pre-commercial heavy oil 2010
      Miss. conversion project delayed
      from 2008 to 2010 due to
      economic factors.

      Conoco Sweeny, TX 247.0 Six weeks of turnaround work Oct 30
      starts Sept. 14 at Units 14,
      9, 38 and 27, which is an
      FCCU.

      Tail gas incinerator shut during Nov. 1
      fall turnaround Sept. 30

      Exxon Baytown 572.5 FCCU No. 3 shut Sep 15. for
      TX planned maintenance.

      Flint Corpus 288.1 $250 mln project for new Spr
      Hills Christi, TX diesel desulfurization, 2010
      sulfur recovery unit to begin
      in Fall 2008. Construction
      to last 18 months.
      Shut Sat Gas Unit No. 1 at the
      west plant for work on Oct. 15.

      Marathon Garyville 245.0 Project to increase crude oil 4Q
      LA refining capacity by 180,000- 2009
      b/d 85% complete, as of end
      April. New units expected
      start up in 4Q 2009.

      Motiva Port Arthur 285.0 Expansion project to increase 1Q

      TX throughput capacity by 325,000 2012
      b/d, to 610,000-b/d, slowed.
      Completion now seen 1Q
      2012, from 2010.

      Shell Deer Park, 340.0 Hydroprocessing unit, cata- Oct 24
      lytic cracker unit and alky-
      lation shut between Oct 1 and
      Oct 24 for fall turnaround
      maintenance.

      Total Port Arthur 232.0 Shut unit 805 for Oct. 8
      maintenance on Oct. 5.
      Shut unit 810 for work Sept.22
      Unit 822 restarted Sept. 29
      Restarted 837 Oct. 1

      Valero Corpus 340.0 Coker unit shutdown for econo- n/a
      Christi, TX mic reasons and planned work;
      delayed to June 19 from June
      12. The 20,000-b/d unit will
      remain off line through July
      but could restart at any time
      if margins improve.

      20,000-b/d FCCU in East n/a
      Plant shut; West Plant
      50,000-b/d FCCU at reduced
      rates since mid-Dec for
      economic reasons.

      Valero Norco, LA 250.0 Upgrade project to build 2012
      a new diesel hydrotreater
      unit moved from 2010 to
      4Q 2012.

      Turnaround at coker unit 1Q
      delayed until 1Q 2010
      from 4Q 2009.
      The coker will operate at
      50% of capacity when
      restarted due to poor
      economics.

      Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a
      TX rates since mid-Dec for
      economic reasons.

      Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a
      rates since mid-Dec for
      economic reasons.

      Valero Three Rivers 95.0 Plant-wide 24-day turnaround Oct. 2
      TX began Sep 9. Restart seen
      around Oct. 2.
      24,000-b/d FCCU at reduced n/a
      rates since mid-Dec for
      economic reasons.

      Western El Paso 122.0 Planned work scheduled for 1Q
      TX 2010.

      Alon Big Spring 67.0 Adding a new ultra low sulfur
      TX gasoline unit; no timeline when
      unit will be operational

      MID-WEST

      Conoco Roxana 306.0 Planned maintenance about to begin,
      Ill co said Sept. 22.

      Conoco Ponca City, 198.4 The refinery is undergoing a
      OK planned turnaround; Co. said
      Oct. 15. No details provided.

      Frontier El Dorado 130.0 FCCU and hydrotreater (gofiner) Nov
      KS will be shut in Oct for turn-
      around maintenance that takes
      place every four years. Crude
      throughput cut to 58,000-b/d
      during work.

      Frontier Cheyenne 48.0 Refinery will process 44,250
      barrels of crude oil through Oct,
      Oct, up from 40,200 b/d in Sep.

      Husky Lima 146.2 70% refinery goes down for Mid-Nov.
      OH planned worked Oct. 1

      Marathon Detroit, MI 102.0 Co pushes back finish date Late
      for heavy oil project. 2012

      Sunoco Toledo, OH 160.0 Planned work to last from Early Oct.
      early Aug to mid-Sep. Co. said
      Oct. 1 work finished.

      Valero Memphis, TN 195.0 FCCU upgrade originally slated 2012
      for completion in 2009 has been
      shifted to 2012.

      ROCKY MOUNTAINS

      Conoco Billings, 61.0 On Mar 5 the co delayed for Jan.
      MT one year an expansion project 2010
      which will increase capacity
      to 71,000 bbls. Construction of
      a new crude unit is now scheduled
      to begin in January 2010.

      Frontier Cheyenne 52.0 The refinery is operating at n/a
      WY reduced rates for economic
      reasons.

      WEST COAST

      Alon Paramount 55.0 Hydrocracker project post-
      CA poned indefinitely, the Co.
      said on Feb. 4

      Chevron Richmond, 243.0 Judge halts construction on n/a
      CA expansion project July 1.

      Flint North Pole 210.0 One of three processing n/a
      Hills AK units has been shut due
      to low jet fuel demand,
      co confirmed on Mar 19.

      (END) Dow Jones Newswires
      10-16-090845ET

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum