      Wednesday Breakout Discussion

      Operations
      1. Hot Drums
      a. Feed orientation
      i. New nozzle technology
      2. Spalling and Heater Fouling
      a. Coating alternatives interested in data/alternatives
      3. Quenching
      a. Use of alternate quench point. Ring Line After 1 hour
      4. Procedure Usage
      a. Trend towards more formalized use of procedures.
      b. Electronic Documentation; update to shift notes when deviation is found

      Safety
      1. Top head exposure
      a. Chemical exposure and steam burns
      b. Adhere to good drum checklist
      i. 215 F
      c. What is the value of measuring that outage
      2. Wear and tear on operators
      a. Fatiguing injuries Knees, Rotator cuffs
      b. Elevator reliability (three trips a shift/12 stories/2592 stairs
      3. Standard of Safety
      a. Theres always the safety framework, such as; OSHA 1910, EPA RP752
      b. What it comes down to is its something you can measure. You have a passion for safety and watch each others backs

      Maintenance/Reliability A
      1. Auto Shift/Switch Tool
      a. Higher pressure all 3 failed
      i. Fix available
      ii. Less exposure to personnel with tool
      2. Bridge Crane
      a. Sized right to be able to operate and maintain.
      3. Conveyer belts
      a. Intelligently design system
      b. Dedicated maintenance crew
      4. Mazes
      a. Not designed for use push too much rate through
      5. Rotary joints/ Air motors
      a. Lubrication with plant air and scheduled PM
      6. Top Heads
      a. Still have manual systems in place; lots of issues

      Maintenance/Reliability B
      1. Maze Pumps
      a. Godwin Pumps more reliable
      b. Hazelton pumps, 8 yrs, hi reliable
      c. Install a shark cage in conjunction with check valve to improve reliability.
      2. Decoking Control Valve.
      a. Typical runtimes between failure 1 to 2 years
      b. 3 primary options for control valve between failure 1 to 2 years
      3. Flowserve
      4. BOC Water Hydraulics
      5. Elwood Valve
      6. Drill stem change out
      a. Hydraulic tools are best for maintenance
      b. Recommend torque each section, measure and record torque values.
      c. Maintain at least 1 complete drill string in stores

      Process
      1. Coke Fines in Water
      a. < 500 ppm = Good
      b. < 2000 ppm = Bad
      2. Hot Drums
      a. Totalizers (Water in, SW out)
      b. COT Ramp (aka Kicker)
      c. Monitor feed quality
      i. Vac EP, recycle, gravity, etc
      3. Heater Fouling
      a. Velocity Steam = more is better
      b. Generally steam preferred over HC
      c. Resonance time vs. Heat flux = Flux wins

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum