      Why do we require MOV’s at the PSV outlet lines, and also what is the procedure that is generally followed for performing the hydraulics checking of the Coke drum PSV’s outlet lines.

    • #5897
      daniel samuel
      Participant

      never heard a mov on the downstream of drum psv (any psv)

    • #5888
      Anonymous
      Inactive

      To avoid potential high H2S content backflow from Blowdown Header, since PSVs are not considered TSO valves. PSV MOVs must be closed before top unheading; the interlock is with Vent valves, so it can be closed only when Vent valves are open, and vent valves can not be closed unless PSV MOVs are open.

    • #5616
      Anonymous
      Inactive

      What is the typiocal valve type for this service? Any particular design features?

    • #5611
      Anonymous
      Inactive

      below , but the material has to be inconel for the below

    • #5066
      David Maia
      Participant

      Generally there is a steam injection before and after the PSV, for line cleaning. The probability of the backflow from blowdown reach the drum is very low. Is the MOV really necessary ?

    • #5065
      Anonymous
      Inactive

      Sir, you’re right, however the low probability of ocurrence does not eliminate the hazard while the close MOV will.
      Lucky

    • #5064
      Anonymous
      Inactive

      Also these valve can are included in the drum vent interlock (limit switch);for safety operationally these valves are been open and close with every operation of decoked

      espana2005

Viewing 7 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum