      Flint Hills Resources is scheduled to start a project to replace their coking unit at their refinery outside of St. Paul, Minnesota starting in May or June of 2008.

    • #7036
      Charles Randall
      Participant

      Yes – this is about 6 month lag from where it was susposed to be but then a lot of construction and drum orders are lagging that much.  Foster Wheeler is doing the drum replacement for Flint Hills along with the drum structure & blowdown system on the No3 coker / coker island – the drums are being replaced on “End of Life” requirements but will be larger than the existing ones. This is part of the Pinebend expansion that will add ~50MBD Heavy crude capacity to plant & push it up to 330 MBD total charge – the plant is on almost a 100% diet of Canadian Bitumen crudes.
       
      Flint Hills also replaced the Corpus Refinery Coke drums in 2007.
       
      Regards

    • #6911
      Anonymous
      Inactive

      Project has been delayed for a third time. An October 2008 start is the current plan.

    • #6809
      Anonymous
      Inactive

      Sorry, make that a fourth time. The project has now been delayed until the first quarter of 2009.

    • #6807
      Anonymous
      Inactive

      If Flint Hills has delayed coker drum replacement a 4th time ….. then they officially move into same category as Pemex & Pdvsa!
      Two delays and it is still in Refinery plan / strategy mode…..but 3-4 delays and it becomes a chinese fire drill or accident waiting to happen.  Delayed replacements of critical equipment with potentials for failure only get delayed on paper ….. in real life if you keep passing a scheduled maintenance downtime it becomes an unscheduled shutdown with repair damage to go along with previous replacement and couple extra weeks as bonus!
       

    • #6756
      Marc Hoss
      Participant

      Guest – Thank you for providing your insight…Flint Hills Resources places a very high priority on Personal and Process Safety. Feel free to contact me if you’d like to discuss our Drum Strategy with respect to these priorities.

Viewing 5 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum