      Anyone experiencing problems with keeping your blowdown/quench system air coolers unplugged during cold weather operation?  Are you using a steam/process gas purge in between drum cycles to prevent gasoil pluggage?

    • #5452

      with cold weather or not these finfan are going to get clogged/plugged with wax, when the temperature is below 350 F, we have implemented a routine procedure to avoid these plugging or to kept operational
      to determine which are blocked, it’s as simple as going to the field and touch the box heads, the procedure is at the stage of stripping / cooling to the blowdown, we turn off a bay, we close the louver and we put the heat exchanger (steam coiler), we do this routinely to all finfan everyday

      we do it this procedure in all our coker and operate very well

      best regards

    • #5445
      Claus Graf
      Participant

      In a coker that I worked some years ago, cold weather was 65 F. Like espana2005, we had steam coils under the finfan coils (without louvers) to prevent plugging.
       
      Regards
       
      CG

    • #5441
      Jeff Lewellen
      Participant

      Thank-you for your replies.  However, our issues occur in the 10 F range.  Closed louvers and steam coils have not always been adequate, and we have resorted to keeping a steam flow through the tubes between drum cycles.  It’s affective, but increases steam usage and generates additional sour water.

Viewing 3 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum