Up to 4,000 contract workers are expected to be employed in the two-month overhaul that started in January of the 103,000-barrel-per-day (bpd) gasoline-producing fluidic catalytic cracking unit at the 265,000 bpd BP refinery in Carson, California.
Author
Posts
Viewing 0 reply threads
You must be logged in to reply to this topic.
2923 Topics3878 Replies
Coking forum
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.