      Jason Schutterle, Sinclair Oil & Steve Carlisle, Lyondellbasell
       
      BEST PRACTICES
      –          Quench Cycles/Hot Spots
      Totalizers for quench water and sour water
      –          Furnace Issues
      Burner cleaning/maintenance
                      PM programs
                      Operations Flexibility
      Spalling
       
      Velocity Steam
                      Heater Inlet PI is a good indicator
                      Charts with valve position and flow rates
      START UP
      –          Make sure the system is dry
      –          Air Free
      –          Take it slow
      –          Start antifoam right away
      –          Start on minute rate
      –          Down fill 1[sup]st[/sup] drum all the way
      –          Test Interlocks
      –          Make sure all electrical equipment is on
      –          Test deluge
       
      SWITCH VALVES
      –          System purge is important
      Lack of steam purge can cause reliability issues with valves
                      N2 for back up purge
      HCGO Properties
      –          Increasing recycle with lower C.R
      –          Quench Oil
      Time/Temp
      HCGO/ LCGO/ Slop
                      Need enough to keep O.H lines wet to prevent fouling
      –          Wash Section – too much pressure can make wash nozzles not work.
      ANTIFOAM
      600,000 cc
      –          Some have antifoam on level control
      –          Carrier
      LCGO/HCGO
      Ratio Controller
      –          Injection Points
      Top is best
      –          Foamovers
      Good level indication
      VELOCITY STEAM (Best Practices)
      –          Looking at heater inlet PIs for steam rates
      –          Charts with valve position and flow rates
      –          If flow meters work use them
      LOTO FOR CONTRACT CUTTING
      Lock out before it’s handed over to contractors.  Contractors apply locks too.
      FURNACE ISSUES (Best Practices)
      –          Rate of rise on skin Tis.
      –          Burner Cleaning

      • Quarterly inspection/ cleaning

      –          Spalling

      • Some use steam without shocking
      • Some use BFW.  Could contain chemicals though
      • Spall as much as possible until you have to come down

      QUENCH CYCLES/ HOTSPOTS (Best Practices)
      –          How much sour water make
      –          Totalizer for water
      –          ½ hour soak helps
      –          Back pressure on drums to mitigate hot spots
      –          Drain and re-quench if you have a hot drum
       
       
      SLURRY FEED (FCC)
      –          Put to quench, can cause problems

      • Coke fines plugging filters
      • Decant coming in cold

      –          Best Practice – Bring in with Feed.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum