      facilitators – Mike Anderson, Early Companies and Jon Cloy, Flexim

      1. Heater: Spalling Frequency

      –          Frequency

      • 31 days
      • 90 days
      • 120 days
      • 190 days

      Major Contributor:  Feed Quality

      1. Spalling: Troubleshooting
      2. Coke Drum: Hot Spots
      3. Coke Drum: Foaming

      –          Light Feed
      –          Leaks into process (steam)
      –          Antifoam usage

      • Too little to late
      1. Crude Blending: Heater Fouling
      2. Unheading Reliability

      –          Water Leaking: Hydraulic System
      –          Possible Leaking Seals: Hydraulic Systems
      –          Bottom Unheading Device Leaks

      • Thermal Cycling

      –          Gasket Issues

      • Torqueing Procedures

      –          Flex-hose leaks

      • Repairs – replacement = 1: 3 or 4 months
      1. Fractionator Over head
      2. Sludge Injection

      –          1 hour
      –          Drum Temperature: 700F
      –          No Operational Limit
       

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum