Carry over main tower

Home Forums Coking Technical Fractionation & Process Process Carry over main tower

Viewing 0 reply threads
  • Author
    Posts
    • #23072
      Hedewandro Lucredi
      Participant

      We are observing some carry over to the top air cooler of the main tower. Frequently we need to clean up the air cooler because the top tower pressure increase. We think that this carry over are from some problem of the tower because sometimes the top temperature increase a lot in short time. The product on the air cooler after analysis indicate 80 % oil and 20 % soluble in water. Anybody has this problem ?

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum