CatCracker Supervisor

Home Forums altairstrickland-displayad FCC Resumes CatCracker Supervisor

Viewing 1 reply thread
  • Author
    Posts
    • #3679
      Juan M. Fernandez
      Participant

      Position: CatCracker Supervisor.
      Experience: 15 years experience, 4 as supervisor.
      Employers: PDVSA, OCN-ExxonMobil, Vectores, C.A.. Country: Venezuela. Nationality: Venezuelan & Spanish.
      Education: High School & Some college.
      Email: jmfl74@hotmail.com
      Phone: +58.414.6951948
      Name: Juan M. Fernandez
      Comments: I have 15 years of experience in Operation Processes Plants of the Oil Industry, working under the standards of quality, security and environment.Specifically I operated and I carried out Commissioning activities in plants of Naphtha Hydrotreating (NHT), Pressure Swing Adsorption (PSA) for the Hydrogen purification, Amine Regeneration (ARU), Sour Water Stripper (SWS), Sulfur Recovery (SRU) and Sulfur Solidification (SSU), Fluid Catalytic Cracking (FCC), Mercaptans Oxidation (MEROX), sweeten and extraction process, and Plants of Oxygenated Compound Production (TAME): In Vectores, C.A. – Consulting Company –, I carried out the revision of Operations Manual and development of Pre-Commissioning Plans of Rotating Equipments in the Expansion Project of METOR Plant.In Operadora Cerro Negro, S.A. – Upgrader –, subsidiary of ExxonMobil of Venezuela, in the Units of NHT, PSA, ARU, SWS, SRU and SSU.In Petroleos de Venezuela S.A. (PDVSA) – Oil Refinery –, in the Units of FCC, MEROX and TAME.Also, I have knowledge about of Desalters, Delayed Coker, Diluent Recovery, Coker Gas Plant processes, Boilers Water Treatment, Potable and Sanitary Facilities, Steam Turbines, Instrument/Utility Air, Tank Farm, Blending Facilities and Flares.My level of english is medium, but I’m taking an english course to learn more about that language. I have double nationality, Venezuelan and Spanish.My first objective is to work for great world-wide oil companies, generating added value, making them more efficient and competitive, demonstrating the importance of the best practice, honesty, security and a solid work ethics. Simultaneously, to continue my professional development and perfect the skills and knowledge I have acquired during my career, doing me more able of confronting new and great challenges.

    • #25464
      smrndrdas
      Member

      We are facing frequent tube failure in FCC wet gas compressor 2nd stage discharge High pressure coolers. grooves were mostly noticed on tube external near the tube sheet & subsequent holed out.

      Do you have any experience in this.

      With regards
      S Das
      CPCL, Chennai

      • #25467

        Failures in the HP condenser can usually be traced back to corrosion and salt deposition. These mechanisms are controlled with water washes at the main fractionator overhead condenser, the LP condenser and the HP condenser. The effectiveness of these washes is monitored by regularly checking the pH, and composition of the water being drawn from the water boots of these same condensers. It is also important to make sure that the rate of water injection is sufficient to assure wetting of all surfaces in the condenser. It sounds like you might have some spots near the end of the tubes where water is not reaching. In such a case you could be measuring good quality water but still seeing some corrosion.

Viewing 1 reply thread
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum