CatCracking-Cyclone Erosion

Home Forums Conferences 2011 Texas CatCracking-Cyclone Erosion

Viewing 0 reply threads
  • Author
    Posts
    • #2283
      4 drums coker
      Participant

      Cyclone Eerosion
      Tony Schmitz, Emtrol

      Cyclone Operation: Not having erosion is better than having erosion
      -Crossover duct configuration can eliminate erosion (see introductory photos)
      -Diplegs diamters are generally designed too big. Emtrol believes 8 dia is typically optimum slows catalyst velocity, eliminates eddy currents.
      -Cyclone cone angles need to be sharp, not shallow
      -When repairing holed cones/dust bowls
      -Preferred method is full-surrouod, hex-anchored refractory, encased in steel jacket
      -Consider using thicker lining (2 vs or 1)

      Preferred Wed Patterns:
      -regen every other hex, every other row
      -reactor every hex, every row

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum