CatCracking – Effective Turnarounds

Home Forums Conferences 2011 Texas CatCracking – Effective Turnarounds

Viewing 0 reply threads
  • Author
    Posts
    • #2284
      4 drums coker
      Participant

      Effective Turnarounds
      Whitney Strickland, Altair Strickland

      1. WorkScope additions (Discovery Work)
      2. What are best practices to minimize or eliminate
      3. Best Practices
      -Bring Contractors in early — utilize contractor to help with risk analysis and workscope generation, also teambuilding with all specialties and crafts involved in the turnaround to buy into common goal.
      -Benchmark healthy unit after turnaround — by benchmarking the unit can be compared to find anomalies that may be an indication of work that needs to be done; this goes along with data mining and thermal studies.
      -Have a multi site experienced FCCU Advisor — the advisor should be involved at the very concept of the project and would be the economic champion to sell the budget to management.
      -Streamline inspection process

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum