Engineering falures do to material corrosion, design flaws and construction defects.
Tej Chadda, FosterWheeler
Jon Hood, Shaw
1. Expansion Joint Failure delete/minimize/upgrade
2. Routine thermal imaging schedule quarterly or daily
3. FEA of critical area
4. Perform refractory dryout and system temperature and movement monitoring PRIOR to operation