Coke cutting technique
From: New Coker
Category: Process
Date: 20 Jan 2005
Comments
The coke handling system in our DCU is slurry type with sluce way and dewater bin. We cut the coke bed in each step with length of only 30cm. This causes a lot of coke fines in the coke handling system. If we increase the stepped cutting length to 100cm, the big fall may damage the guide chute under the bottom head. Who could help us?
Transferred to this Forum January 2005 by the coking.local Forum administrator