Do you’ll have a feed surge tank or drum before the feed enters the Frac bottoms or heaters?
My tank level gauge failed and I am planning on installing a new radar level by opening and changing out a 5X6 ft man-way on top of the tank. Have you heard of anyone opening or changing out a live nitrogen purge 450 deg pitch tank top man-way? the tank operates at 420-460 deg at approximately 3-6 inches of water column.