Delayed Coking – Maintenance and Operations

Home Forums refcomm-rio-slider-wh Delayed Coking – Maintenance and Operations

Viewing 0 reply threads
  • Author
    Posts
    • #1860
      4 drums coker
      Participant

      Maintenance and Operations Friday 5/4/2012

      PIT PUMPS
      – Hoses
      — ss braided vs ribbed
      — pipe cage to support hoses
      – Back to vertical pump with hard pipe suction

      PM ON UPPER STRUCTURE
      – weekly with operator
      – monthly with rigging crew
      – structural & cutting assembly bolting
      – sheave greasing

      HEATER MULE EARS
      – new plugs
      – recap seats

      INTERLOCKS ON VALVING
      -building light retrofit
      – actuator/ stem
      – redundant temperature
      — spaced 18″
      — routine maintenance

      TRANSMITTERSPRE BRITTLE FRACTION ON 9 CHROME
      – overhead as 5 cr or cs

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum