Includes Safety, Maintenance, Inspection, Production

Home Forums co-forum Training, services, people, procedures, lessons learned Includes Safety, Maintenance, Inspection, Production

Viewing 0 reply threads
  • Author
    Posts
    • #46841
      Anonymous
      Guest

      THE IDEAL COKER:

      Includes the following considerations:
      – Safety
      – Maintenance
      – Inspection
      – Production

      Turnaround Length in industry is from 5 to 9 years
      _______________________________________________________________

      TRAINING:
      + Simulator in Place
      + Weekly Simulation Problem
      + Monthly Operations Team reviews of Procedures

      DUST FREE
      + Effective Wetting Systems in place for all coke inventories
      + Regular clean-up of coke spilled during transport
      + Coke well-cooled prior to cutting

      ENVIRONMENTAL:
      + Recover all PRV & Blowdown Effluents
      + Water recycled or sent to SWS

      OPERATIONS:
      + Minimal operator presence on the coke drum structure
      + Videocameras
      + Robotics

      MAINTENANCE:
      + PM tracked & optimized
      + Optimal spread between Operations & Mechanical personnel
      + Zero backlog
      + No flush needed to heavy oil pumps

      COKE DRUMS:
      + Coke Drum life is >50 yrs
      + Crack monitoring 100% effective

      HEATERS:
      + Temperature reliably measured without thermocouples
      + Tubes can run up to 1400°F

      …from group 2

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum