Maintenance & Reliability

Home Forums Conferences 2008 Breakout Discussion – Calgary Maintenance & Reliability

Viewing 0 reply threads
  • Author
    Posts
    • #47137
      Anonymous
      Guest

      ~ Drum Cracks / Bulges                – Cycle Timing, Location of Cracks, Drum Design, Inspection Program, Warm-up Procedures~ Drill Stem Failures                – Thread Failures, Life Cycle, Third party, inspection program important, Gap vs. Torque Spec, Coke Quality / Cave ins~ Drum Feed entry                – Design, Quench issue, Cladding crack issues, Hot Spots quench vs drum wall, Feed Piping Symetrical Drain~ Furnace Tube Issues                – Tube Wall vs U Bend, Corrosion vs Erosion, Velocities, Coatings 

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum