      <Here is Bloomberg update NA Refinery S/D for 2008 & look back at 2007 – doesn’t look any lighter this year, but is heavier in 1Q & 4Q08 compared to ~3Q & 4Q 2007- CER> 
      North American Refinery Shutdowns, Maintenance 2007-08 (Table)
      2008-01-31
      18:08 (New York)

      By Robert Tuttle
           Jan. 31 (Bloomberg) — The following is a table of
      scheduled and unplanned refinery shutdowns in North America. The
      list only includes shutdowns that could be confirmed.

      *T
      Refinery       Date       Shutdown Capacity  Unit/Reason
      New Information

      Tesoro          January   Partial  121,000   Unspecified unit or units are
      Anacortes,                                   down for maintenance.
      Washington                                  
                                                  

      First Quarter 2008

      BP Texas City,  Jan. 30   Partial  475,000   Fluid catalytic cracker with
      Texas                                        120,000 barrels a day capacity
                                                   shuts because of an electrical
                                                   fault. Start up scheduled for
                                                   Jan. 30 or Jan. 31.
                                                  
      Valero Benicia, Unknown   Partial  153,000   Operating rates cut because of
      California                                   weak refinery margins.
                                                  
      Valero Aruba    Jan. 25   Full     275,000   Refinery shut after fire in
                                                   vacuum tower. Refinery to
                                                   resume partial operations by
                                                   Feb. 12. Full operations
                                                   restored in three months.
                                                  
      Valero Corpus   January   Partial  340,000   Sulfur recovery unit shut for
      Christi, Texas                               maintenance. Unit started up
                                                   by Jan. 24.
                                                  
      Tesoro          Jan. 22   Partial  103,500   Undisclosed unit shut until
      Wilmington,                                  Feb. 3.
      California                                  
                                                  
      Marathon        Jan. 22   Partial  275,000   Fluid catalytic cracker, with
      Garyville,                                   127,000 barrel a day capacity,
      Louisiana                                    shut for maintenance.
                                                  
      ConocoPhillips  Jan. 21   Partial  152,000   Maintenance work on hydrogen
      Borger, Texas                                desulfurization unit to have
                                                   minimal affect on production.
                                                   Unit to be back to normal by
                                                   end of the week.
                                                  
      Valero Port     Jan. 18   Partial  325,000   Gasoline hydrotreater shut.
      Arthur, Texas                               
                                                  
      Motiva Port     Jan. 14   Partial  285,000   Waste-heat boiler associated
      Arthur, Texas                                with a fluid catalytic cracker
                                                   shut for 20 days of repairs.
                                                  
      Tesoro          Late Q1   Unknown  170,000   Processing rates affected by
      Martinez,                                    installation of delayed coking
      California                                   unit. Unspecified units to be
                                                   shut for maintenance.
                                                  
      Valero Port     January,  Partial  265,000   Maintenance planned for 25
      Arthur, Texas   February                     days on 105,000 barrel-a-day
                                                   coker unit. Repairs will cut
                                                   production by 100,000 barrels
                                                   a day.
                                                  
      Exxon Mobil     Jan. 12   Partial  586,000   Shutdown of crude unit for
      Baytown, Texas                               maintenance followed by
                                                   shutdown of coker for repairs.
                                                   Maintenance scheduled for
                                                   completion by late February,
                                                   early March.
                                                  
      Total Port      Jan. 8    Partial  240,000   A unit to be shut because of
      Arthur, Texas                                unfavorable operating
                                                   conditions.
                                                  
      Valero Aruba    Jan. 8    Full     275,000   Power disruptions shuts
                                                   refinery. Startup commenced by
                                                   Jan. 9.  One of two crude
                                                   units started up by Jan. 15.
                                                   Second crude unit and coker
                                                   return to service by Jan. 22.
                                                  
      BP Carson,      Jan. 9    Partial  265,000   Shutdown of fluid catalytic
      California                                   cracking and alkylation units
                                                   for maintenance. Shutdown to
                                                   begin by Jan. 13.
                                                   
      ConocoPhillips  Jan. 7    Partial  146,000   Maintenance to be performed on
      Borger, Texas                                an electrostatic precipitator
                                                   through Jan. 16.
                                                  
      Delek Tyler,    Jan. 7    Partial  60,000    Two sulfur recovery units shut
      Texas                                        after a power failure. Both
                                                   brought restarted.
                                                  
      Lyondell        Jan. 4    Partial  268,000   Thermal oxidizer, two in-line
      Houston, Texas                               heater blowers idled by power
                                                   failure.
                                                  
      ConocoPhillips  Jan. 5    Partial  247,000   Several aromatics units shut
      Sweeny, Texas                                after transformer malfunction.
                                                  
      Alon Big        Jan. 4    Partial  70,000    Refinery running at 57 percent
      Spring, Texas                                capacity while 10 days of
                                                   maintenance performed on
                                                   reformer. Normal operations to
                                                   be restored by Jan. 17.
                                                  
      Exxon Mobil     Jan. 4    Partial  192,000   Maintenance on a fluid
      Chalmette,                                   catalytic cracker, alkylation
      Louisiana                                    unit and other units to last
                                                   until the end of February.
                                                  
      Shell Deer      Jan. 17   Partial  340,000   Fluid catalytic cracker,
      Park, Texas                                  gasoline hydrotreater,
                                                   alkylation unit, girgotol and
                                                   sulfur recovery units 3, 4 and
                                                   5 to be shut during a
                                                   maintenance period lasting
                                                   until late February.
                                                  
      Delek Tyler,    Jan. 4    Partial  60,000    Maintenance performed on
      Texas                                        diesel hydrotreater with
                                                   shutdown of sulfur recovery
                                                   plant and sour water stripper.
                                                   
      BP Whiting,     Late      Partial  420,000   Crude unit, with 95,000 barrel
      Indiana         December                     a day capacity, is shut for
                                                   repairs.
                                                   
      Alon Big        Jan. 2    Partial  70,000    Sulfur recovery unit shut
      Spring, Texas                                down. Started up later the
                                                   same day.
                                                  
      BP Texas City,  Dec. 31   Partial  475,000   No. 3 alkylation unit to shut
      Texas                                        for 90 days of repairs.
                                                  
      Flying J        Late      Partial  68,000    Maintenance to be performed on
      Bakersfield,    January,                     undisclosed unit.
      California      2008                        
                                                  
      Sunoco Toledo,  March,    Partial  165,000   Hydrocracker to be shut to
      Ohio            April                        change catalyst. Crude unit
                                                   scheduled for Q4 shutdown may
                                                   be shut also. 
                                                  
      Valero Benicia, February  Partial  170,000   Company to perform 12 days of
      California                                   repairs to hydrocracker,
                                                   affecting 37,500 barrels of
                                                   distillation potential.
                                                   
      Valero St.      February  Partial  250,000   Maintenance planned for 20
      Charles,                                     days on fluid catalytic
      Louisiana                                    cracking unit, reducing
                                                   production capacity by 100,000
                                                   barrels a day.
                                                   
      Valero, Quebec  March and Partial  215,000   Maintenance to be performed
                      April                        for 42 days on crude
                                                   distillation unit, reducing
                                                   production capacity by 50,000
                                                   barrels a day.
                                                  
      Frontier     El March or  Partial  110,000   Shutdown of crude unit, fluid
      Dorado, Kansas  April                        catalytic cracker and coker
                                                   for maintenance and upgrade.

      Second Quarter 2008

      Valero Corpus   May       Partial  146,000   Company to perform 14 days of
      Christi, Texas                               maintenance on crude unit in
                                                   the west plant, affecting
                                                   40,000 barrels of daily
                                                   production capacity.

      Third Quarter 2008

      Petro-Canada   August     Full     135,000   Refinery to be shut for as
      Edmonton,      2008                          many as 60 days to allow new
      Alberta                                      units to be added.
                                                  
      Holly Woods    Q3         Full     26,000    Refinery to be shut in middle
      Cross, Utah                                  of third quarter for
                                                   maintenance and expansion.

      Fourth Quarter 2008

      Sunoco Toledo, Q4 2008    Partial  165,000   Scheduled shutdown of crude
      Ohio                                         unit and fluid catalytic
                                                   cracker for maintenance.
                                                  
      Alon           Dec. 1,    Full     55,000    Refinery to be shut for 16
      Paramount,     2008                          days of maintenance.
      California                                  
                                                  
      Pemex Salina   October    Partial  290,000   Reformer to be shut for
      Cruz, Mexico                                 maintenance.
                                                  
      Holly Artesia, Q4         Full     85,000    Refinery to be shut in middle
      New Mexico                                   of fourth quarter for
                                                   maintenance and expansion. 

      Unknown Quarter 2008

      Sunoco          2008      Partial  355,000   Fluid catalytic cracker to be
      Philadelphia                                 shut for maintenance.
      Pennsylvania                                
      BP Texas City,  Unknown   Partial  475,000   No. 2 alkylation unit to be
      Texas                                        dismantled after maintenance
                                                   is complete on No. 3 unit.
                                                  
      Flying J        Late 2008 Partial  68,000    Maintenance on undisclosed
      Bakersfield,                                 units.
      California                                  
                                                  

      Fourth Quarter 2007

      Alon           Dec. 19    Partial  55,000    Portion of refinery shut after
      Paramount,                                   power disruption. Some units
      California                                   restore operation by Dec. 20.
                                                   All units to be restored by
                                                   Dec. 21.
                                                   
      Kern           Dec. 20    Partial  27,000    Desulfurization unit shut
      Bakersfield,                                 after fire in diesel line.
      California                                  
                                                  
      Total Port     Dec. 20    Partial  240,000   Benzene combustor to be shut
      Arthur, Texas                                for maintenance.
                                                  
      Exxon Mobil    Dec. 17    Partial  586,000   Fluid catalytic cracker goes
      Baytown, Texas                               into standby mode and
                                                   restarted. Production was not
                                                   affected.
                                                  
      Citgo Corpus   Dec. 16    Partial  156,000   Fluid catalytic cracker idled
      Christi, Texas                               by malfunction. Unit returned
                                                   to service after a few hours.
                                                  
      Frontier       Dec. 15    Full     52,000    Refinery crude unit at reduced
      Cheyenne,                                    rates after fire in coking
      Wyoming                                      unit. Operation restored to
                                                   coker Jan. 11.
                                                  
      Exxon Mobil    Dec. 11    Partial  363,100   Process rates reduced at
      Beaumont,                                    refinery after fire in a
      Texas                                        platinum reformer. Refinery
                                                   output normal by Dec. 18.
                                                  
      Exxon Mobil    Dec. 7     Partial  155,800   Two boilers shut down and
      Torrance,                                    started back up. Operations
      California                                   resumed Dec. 13.
                                                  
      Total Port     Dec. 7     Partial  240,000   Unit depressurized to perform
      Arthur, Texas                                maintenance. Main air blower
                                                   of unit 836 shut down and was
                                                   being started. Processing
                                                   rates were reduced at 3 other
                                                   units, including a distillate
                                                   hydrotreater.
                                                  
      Total Port     Dec. 4     Partial  240,000   Unit depressurized to perform
      Arthur, Texas                                maintenance. Unit 822 flared.
                                                  
      Tesoro         Dec. 6     Partial  103,500   Maintenance being performed on
      Wilmington,                                  an undisclosed unit.
      California                                  
                                                  
      Alon Big       Dec. 4     Partial  70,000    Repairs to a propane
      Spring, Texas                                deasphalter cut production
                                                   capacity by 20,000 barrels a
                                                   day. Compressor shut Dec. 3.
                                                  
      Total Port     Dec. 4     Partial  240,000   Refinery shuts unidentified
      Arthur, Texas                                process unit for maintenance.
                                                  
      Total Port     Dec. 5     Partial  240,000   Maintenance on fluid catalytic
      Arthur, Texas                                cracker  units 807 and 835.
                                                  
      Koch Corpus    Dec. 3     Partial  300,000   Sulfur recovery unit shut to
      Christi, Texas                               repair waste heat boiler.
                                                   Restart began Dec. 4.
                                                  
      Valero Texas   Dec. 2     Full     245,000   Refinery idled by power
      City, Texas                                  disruption. Plant restarting
                                                   Fluid catalytic cracker
                                                   restarted by Dec. 11. All
                                                   major process units running by
                                                   Dec. 27 and plant expected
                                                   back to normal by year’s end.
                                                   Normal operations restored by
                                                   Jan. 9.
                                                  
      BP Texas City, Dec. 2     Partial  417,000   Refinery lost power to at
      Texas                                        least two units, a reformer
                                                   and ultracracker. Ultracracker
                                                   started between Dec. 2 and
                                                   Dec. 8. Two cokers returned to
                                                   normal rates by Dec. 4. Ultra
                                                   cracker started up Jan. 5 to
                                                   Jan. 10.
                                                  
      Delek Tyler,   Nov. 27    Partial  60,000    Refinery fluid catalytic
      Texas                                        cracker malfunctions.
                                                   Operational adjustments were
                                                   made to return the unit to
                                                   normal.
                                                  
      ConocoPhillips Nov. 25    Partial  238,000   Refinery resumes operation
      Linden, New                                  after being partially shut
      Jersey                                       Nov. 25.
                                                  
      ConocoPhillips Nov. 25    Partial  146,000   Electrostatic precipitator
      Borger, Texas                                shut through Dec. 5 for
                                                   maintenance.
                                                  
      Citgo Corpus   Unknown    Partial  156,000   Planned shutdown of an
      Christi, Texas                               incinerator associated with a
                                                   sulfur recovery unit. Shutdown
                                                   was expected to result in
                                                   emissions from Nov. 25 through
                                                   Dec. 1.
                                                  
      Valero Three   Nov. 20    Partial  100,000   Fluid catalytic cracker and
      Rivers, Texas                                hydrocracker started up after
                                                   shut down caused by a power
                                                   disruption.
                                                  
      Valero         Nov. 20    Partial  190,000   Fluid catalytic cracker shut
      Memphis,                                     for 10 days unplanned
      Tennessee                                    maintenance. Unit back up by
                                                   Nov. 30.
                                                  
      Shell          Oct. 10    Unknown  130,000   Refinery returning to normal
      Montreal,                                    rates after an extended period
      Canada                                       of maintenance.
                                                  
      Flint Hills    Nov. 18    Partial  300,000   The refinery shut its
      Resources                                    processing units for about
      Corpus                                       eight days of maintenance.
      Christi, Texas                               Production is scheduled to
                                                   resume Nov. 26.
                                                   
      Western        Nov. 19    Partial  125,000   A fire caused the refinery to
      Refining                                     shut a diesel hydrotreater.
      El Paso, Texas                               Unit restored to full
                                                   production by Nov. 24.
                                                  
      Exxon Mobil    Nov. 13    Partial  348,500   Process rates reduced on
      Beaumont,                                    112,000 barrel-a-day fluid
      Texas                                        catalytic cracker to repair a
                                                   compressor leak. The unit
                                                   restarted Nov. 16.
                                                   
      Alon Big       Nov. 13    Full     70,000    Crude unit shut for a few
      Spring, Texas                                hours after a power
                                                   interruption.
                                                   
      Alon Big       Nov. 8     Partial  70,000    Sulfur recovery unit shut
      Spring, Texas                                because of a leak. Unit
                                                   returns to service Nov. 9.
                                                  
      BP Carson,     Nov. 10 or Partial  260,000   Reformer unit to be shut for
      California     Nov. 11                       three weeks of maintenance.
                                                   Unit started up by Nov. 29.
                                                  
      Tesoro         Nov. 4     Partial  94,000    Refinery operating at reduced
      Kapolei,                                     rates after Nov. 4 power
      Hawaii                                       disruption caused by a storm.
                                                   Reformer unit was damaged.
                                                   Reformer operations to be
                                                   restored week Dec. 17, after
                                                   which gasoline production to
                                                   be restored.
                                                    
      Valero         Nov. 8     Partial  265,000   A power disruption followed by
      Port Arthur,                                 a fire in a heater at a
      Texas                                        distillate hydrotreating unit.
                                                   Hydrotreater shut down. A
                                                   crude unit, fluid catalytic
                                                   cracker and reformer lost
                                                   power. Most units are
                                                   operating. Refinery up to
                                                   processing 260,000 barrels a
                                                   day by Nov. 12, close to
                                                   pre-fire rates. Kerosene
                                                   hydrotreater started by Nov.
                                                   27.
                                                  
      Alon           November   Partial  90,000    The No. 2 crude unit will
      Paramount,                                   undergo maintenance until
      California                                   April 2008.
                                                  
      Exxon Mobil    Nov. 6     Partial  155,000   Shut fluid catalytic cracker
      Torrance,                                    and alkylation unit for
      California                                   “several weeks” of
                                                   maintenance. Cat cracker and
                                                   alkylation unit to be started
                                                   between Nov. 22 and Nov. 27.
                                                   Units started by Nov. 28.
                                                  
      BP Texas City, Nov. 5     Partial  470,000   Aromatics unit shuts down
      Texas                                        after a compressor shut off.
                                                   Restart was scheduled.
                                                  
      Motiva         Nov. 6     Unknown  235,000   Fire happens in crude
      Convent,                                     processing unit. Company
      Louisiana                                    declines to say if unit is
                                                   operating or how production
                                                   was affected. Refinery returns
                                                   to normal operations by Nov.
                                                   13.
                                                  
      Delek Tyler,   Oct. 29    Partial  60,000    Sulfur recovery unit shut
      Texas                                        after steam leak. Unit
                                                   returned to service by Nov. 2.
                                                  
      Exxon Mobil    Oct. 12    Partial  348,500   Fluid catalytic cracker shut
      Beaumont,                                    for repairs. Unit returns to
      Texas                                        services by Nov. 3.
                                                  
      Marathon       October or Unknown  222,000   Processing units started after
      Catlettsburg,  September                     several weeks of maintenance.
      Kentucky                                    
      Flying J       Oct. 27    Partial  68,000    Hydrocracker shut after loss
      Bakersfield,                                 from an electrical
      California                                   transformer.
                                                   
      Shell Deer     Oct. 28    Partial  340,000   Hydrotreater unit shut after
      Park, Texas                                  fire.
                                                   
      Lyondell       Oct. 26    Partial  268,000   Process rates reduced for the
      Houston, Texas                               “next several days” after a
                                                   fire in a crude unit. Unit
                                                   started Oct. 30. Rates
                                                   returned to normal by Oct. 31.
                                                   
      Delek Tyler,   Oct. 24    Partial  60,000    Fluid catalytic cracker shut
      Texas                                        after power interruption. Unit
                                                   returned to service Oct. 25.
                                                  
      Chevron        Oct. 24    Partial  270,000   Compressor malfunction on
      El Segundo,                                  hydrotreating unit. Plant will
      California                                   have to make adjustment to run
                                                   rates.
                                                  
      Citgo Corpus   Oct. 24    Partial  156,000   The refinery plans maintenance
      Christi, Texas                               this week through Oct. 27.
                                                    
      BP Plc.        Various    Partial  460,000   The company will start a
      Texas City,                                  250,000 barrel-a-day crude
      Texas                                        unit that was down since Sept.
                                                   2005 by February. It will also
                                                   start a 100,000 barrel-a-day
                                                   cat fee hydrotreating unit,
                                                   fluid catalytic cracker and a
                                                   coker.
                                                   Cat-feed hydrotreater, coker
                                                   started the week of Nov. 19.
                                                   Cat cracker started early
                                                   December. Start of a crude
                                                   unit is scheduled for first
                                                   quarter, which will bring the
                                                   operating capacity up to
                                                   400,000 barrels a day.
                                                  
      ConocoPhillips Oct. 23    Partial  247,000   The refinery’s coker returned
      Sweeny, Texas                                to normal rates. It was
                                                   operating at reduced rates
                                                   since Oct. 7. A sweet-crude
                                                   unit lost power accidentally
                                                   during fluid catalytic cracker
                                                   maintenance.
                                                  
      ConocoPhillips Oct. 20    Partial  146,000   Fluid catalytic cracker shut
      Borger, Texas                                for maintenance. Operations to
                                                   resume on Nov. 24.
                                                  
      Citgo Corpus   Oct. 22    Partial  156,000   Refinery to perform three days
      Christi, Texas                               of maintenance on a unit. Work
                                                   is scheduled to end Oct. 25.
                                                  
      Total Port     Oct. 22    Partial  240,000   Refinery to perform
      Arthur, Texas                                maintenance on a compressor
                                                   for 22 days.
                                                    
      Total Port     Oct. 23    Partial  240,000   Sulfur recovery unit shut down
      Arthur, Texas                                and other processing equipment
                                                   slowed. 
                                                  
      Exxon Mobil    Oct. 17    Partial  60,000    Refinery scales back
      Billings,                                    operations after a fire in a
      Montana                                      hydrocracker unit. All units
                                                   repaired and operating by Jan.
                                                   7. Refinery continues to run
                                                   at reduced rates.
                                                  
      Valero         Unknown    Partial  195,000   Refinery started a catalytic
      Paulsboro, New                               hydro-desulfurization unit
      Jersey                                       Oct. 11.
                                                  
      Tesoro         Oct. 13    Partial  100,000   Hydrocracker shut. Start began
      Wilmington,                                  Oct. 15.
      California                                  
                                                  
      Harvest Energy Oct. 12    Partial  115,000   The company will perform
      Trust,                                       maintenance on its North
      Newfoundland,                                Atlantic refinery’s crude
      Canada                                       unit, hydrocracker and
                                                   platformer regeneration unit,
                                                   cutting output by more than a
                                                   third this quarter to about
                                                   73,000 barrels a day, a
                                                   spokeswoman said. Crude unit
                                                   and vacuum tower started Dec.
                                                   1 and Dec. 2 and will be at
                                                   full rates in two days.
                                                  
      Irving Saint   Oct. 9     Partial  300,000   Shutdown of fluid catalytic
      John, New                                    cracking and alkylation units
      Brunswick                                    for 45 days of maintenance.
                                                   
      Total Port     Oct. 10    Partial  240,000   Shutdown of unit 805 until
      Arthur, Texas                                Oct. 25.
                                                  
      Chevron El     Oct. 10    Partial  270,000   Shutdown of coker unit for two
      Segundo,                                     months of planned maintenance.
      California                                  
                                                  
      Valero Aruba   Oct. 5     Full     275,000   Shutdown of refinery after
                                                   power failure. Some units
                                                   restarted by Oct. 16. Full
                                                   operations restored Oct. 24.
                                                  
      Shell          Oct. 9     Partial  156,000   Shutdown of distillate
      Martinez,                                    hydrotreater after operational
      California                                   upset. Equipment failed on a
                                                   wet gas compressor associated
                                                   with a fluid catalytic
                                                   cracker. Both the compressor
                                                   and cat cracker are running.
                                                   Hydrotreater was running by
                                                   Oct. 10.
                                                  
      Hess Port      Oct. 8     Full     65,000    Refinery shut after problem in
      Reading, New                       Cat       a compressor. Operations
      Jersey                             Cracker   restored by afternoon of Oct.
                                         Capacity  10. Refinery’s main unit is a
                                                   fluid catalytic cracker.
                                                  
      Valero Texas   October    Partial  245,000   Maintenance being performed
      City, Texas                                  for 40 days on 85,000
                                                   barrel-a-day fluid catalytic
                                                   cracker.
                                                  
      Valero         October    Partial  195,000   Planned maintenance for 29
      Paulsboro, New                               days on crude unit. Unit
      Jersey                                       started up by Nov. 12.
                                                  
      Valero         October    Partial  170,000   Planned maintenance on 170,000
      Benicia,                                     barrel-a-day coker unit for 30
      California                                   days. Maintenance complete by
                                                   Nov. 23.
                                                  
      BP Carson,     Oct. 4     Partial  260,000   Shutdown of crude unit, coker
      California                                   and reformer for three weeks
                                                   of maintenance. Start up
                                                   begins Nov. 2.
                                                  
      Suncor         Oct. 2     Full     30,000    Shutdown of refinery for 30
      Commerce City,                               days of maintenance.
      Colorado                                    
                                                  
      ConocoPhillips Oct. 6 or  Partial  139,000   Hydrocracker shut down during
      Carson,        7                             start up of refinery after
      California                                   Oct. 3 power failure. Refinery
                                                   operating at reduced rates.
                                                    
      ConocoPhillips Oct. 5     Partial  146,000   Units associated with a fluid
      Borger, Texas                                catalytic cracker are
                                                   undergoing maintenance this
                                                   month. There will be no impact
                                                   on production, a spokeswoman
                                                   said.
                                                  
      Valero         Unknown    Partial  210,000   The company restarted a
      Delaware City,                               reformer unit Oct. 5. A
      Delaware                                     spokesman decline to say if
                                                   the refinery was fully
                                                   operational.
                                                  
      Valero Port    Oct. 5     Partial  265,000   The refinery shut some units
      Arthur, Texas                                including a hydrotreater for
                                                   “planned catalyst
                                                   maintenance.” They will be
                                                   restarted Oct. 11, according
                                                   to a state report.

      Exxon Mobil    Oct. 3    Partial  155,800   The company started a hydrogen
      Torrance,                                   unit at the refinery after an
      California                                  Oct. 3 power interruption.
                                                 
      Flying J       Oct. 4    Partial  68,000    An equipment failure caused
      Bakersfield,                                flaring.
      California                                 
      ConocoPhillips Oct. 3    Full     140,000   The refinery is restarting
      Wilmington,                                 after a one-hour power failure
      California                                  caused all processing units to
                                                  shut down. Start up of unit
                                                  Oct. 17.
                                                 
      Chevron        Oct. 3    Partial  270,000   A compressor for the
      El Segundo,                                 refinery’s continuous
      California                                  catalytic reformer unit shut
                                                  down, causing flaring.
                                                 
      ConocoPhillips Oct. 3    Partial  247,000   The company shut a
      Sweeny, Texas                               30,000-barrel-a-day fluid
                                                  catalytic cracker and a
                                                  gas-recovery unit for repairs.
                                                  Cat cracker start up began by
                                                  Nov. 5.
                                                 
      Valero         Oct. 3    Full     135,000   A one-hour power failure
      Wilmington,                                 caused all processing units to
      California                                  shut down. Refinery at planned
                                                  rates by weekend of Oct. 6.
                                                 
      Valero,        Oct. 1    Partial  130,000   A power failure caused a crude
      Houston, Texas                              unit and regenerator to shut
                                                  down. Restart began
                                                  immediately, a spokesman said.
                                                 
      Frontier       Mid-OctobePartial  110,000   Shut alkylation unit for about
      El Dorado,     r                            18 days of maintenance.
      Kansas                                     
                                                 
      Valero         November  Partial  135,000   Planned maintenance for 45
      Wilmington,                                 days on a fluid catalytic
      California                                  cracker. Unit restarted by
                                                  Jan. 8.
                                                 
      BP Plc. Texas  Q4        Partial  460,000   Planned maintenance on coker
      City, Texas                                 unit.
                                                 
      Chevron   El   Q4        Partial  270,000   Shutdown of coker unit for
      Segundo,                                    maintenance.
      California                                 

      Third Quarter 2007

      Koch Industries Sept. 23  Partial  300,000   Will shut down units for
      Corpus Christi,                              routine maintenance, expected
      Texas                                        to last until Oct. 1.
                                                  
      Total, Port     Sept. 29  Partial  240,000   Electrical malfunction caused
      Arthur, Texas                                temporary shutdown of
                                                   production unit.
                                                  
      Hovensa, Virgin Sept. 27  Partial  500,000   Fluid catalytic cracker
      Islands                                      started Sept. 28 after
                                                   shutdown the day before for
                                                   repairs. The cracker can
                                                   process 150,000 barrels a day
                                                   of gasoline and distillate
                                                   fuels.
                                                  
      Motiva Port     Sept. 13  Partial  285,000   All units shut after power
      Arthur, Texas                                disruption caused by
                                                   hurricane. The company
                                                   restored about 80 percent of
                                                   production by Sept. 26. All
                                                   production to be restored this
                                                   week.
                                                   
      Total Port      Sept. 13  Full     240,000   Partial power loss caused by
      Arthur, Texas                                hurricane forces plant to run
                                                   units in circulation mode.
                                                   Refinery was not producing
                                                   fuel. Plant resumed operations
                                                   by Sept. 26.
                                                  
      Valero Port     Sept. 13  Full     265,000   All units shut after power
      Arthur, Texas                                disruption caused by
                                                   hurricane. Most of refinery
                                                   resumed operation by Sept. 26.
                                                   Crude unit started up Oct. 18
                                                   after maintenance performed.
                                                  
      Valero McKee,   Sept. 18  Partial  170,000   Maintenance on
      Sunray, Texas                                catalytic-cracking unit will
                                                   limit gasoline and distillate
                                                   output for 14 days.
                                                  
      Alon USA Energy Sept. 23  Unknown  75,000    Compressor went down.
      Big Spring,                                 
      Texas                                       
                                                   
      Holly Corp.     Sept. 18  Full     26,000    Power disruption shuts
      Woods Cross,                                 refinery. Operations restored
      Utah                                         the next day.

      Chevron El      Sept. 19  Partial  270,000   Shut hydrocracking unit for
      Segundo,                                     part of the day. Unit to be
      California                                   back to normal in 24 hours.
                                                  
      Federated       Sept. 18  Full     100,000   Refinery shuts down after
      Co-operative                                 power disruption. Restart to
      Regina,                                      take 24 to 36 hours.
      Saskatchewan                                
                                                  
      Petroleos       Sept. 10  Partial  273,000   Pipeline blasts reduce oil
      Mexicanos,                                   supply to refinery. Output cut
      Tula, Mexico                                 by 50 percent on a unit.
                                                  
      Koch Corpus     Unknown   Unknown  300,000   Process units shut. Flaring
      Christi, Texas                               associated with start up of
                                                   the units began the weekend of
                                                   Sept. 15.
                                                  
      ConocoPhillips  Sept. 16  Partial  146,000   Carbon monoxide boiler
      Borger, Texas                                associated with a fluid
                                                   catalytic cracking unit
                                                   undergoes repairs. Maintenance
                                                   scheduled to last until Sept.
                                                   26.
                                                  
      Tesoro          Sept. 8   Partial  166,000   Shuts one of two crude units
      Martinez,       or 9                         for repairs. Refinery operated
      California                                   at reduced rates. Unit started
                                                   up Sept. 12.
                                                  
      Alon Big        Sept. 11  Partial  70,000    Shut sulfur recovery unit for
      Spring, Texas                                repair.
                                                  
      BP Texas City,  Sept. 8   Partial  460,000   Shut hydrotreater after
      Texas                                        malfunction. Unit will be down
                                                   a month.
                                                  
      BP Carson,      Sept. 10  Partial  260,000   Output will be curbed to make
      California                                   minor repairs. 
                                                  
      ConocoPhillips  Sept. 6   Partial  247,000   Shut 72,000 barrel-a-day fluid
      Sweeny, Texas                                catalytic cracker to make
                                                   emergency repairs. Start up
                                                   began Sept. 17. 
                                                  
      Total Port      Sept. 6   Partial  240,000   Shut unit so maintenance could
      Arthur, Texas                                be completed. Unit was being
                                                   restarted Sept. 9.
                                                  
      Exxon Mobil     Aug. 29   Partial  188,000   Shutdown 70,000 barrel a day
      Corp.                                        fluid catalytic cracker for
      Chalmette,                                   “several weeks” of
      Louisiana                                    maintenance. Unit started by
                                                   Sept. 17.
                                                  
      CHS Inc.        Mid-AugustFull     55,000    Shutdown of refinery until the
      Laurel, Montana                              end of September for
                                                   maintenance.
                                                  
      BP Plc Toledo,  Sept. 12  Full     155,000   Refinery shut for about 8
      Ohio                                         weeks for maintenance. Crude
                                                   units, fluid catalytic cracker
                                                   started up by Dec. 6. All
                                                   major process units return to
                                                   operation by Dec. 14.
                                                  
      Total Port      Aug. 27   Partial  240,000   Shut fluid catalytic cracker
      Arthur, Texas                                after lightening cut power.
                                                   Startup began Aug. 28 and unit
                                                   had returned to service by
                                                   Aug. 29.
                                                  
      Alon Big        Aug. 24   Partial  70,000    Shut fluid catalytic cracker
      Spring, Texas                                for maintenance. Started unit
                                                   the next day.
                                                  
      Shell Deer      Aug. 22   Partial  340,000   Reduced rates expecting cut in
      Park, Texas                                  crude supplies because of
                                                   Hurricane Dean. Rates to be
                                                   restored by Aug. 25 or 26.
                                                  
      Suncor Sarnia,  Sept. 4   Partial  70,000    Shut hydrocracker for 83 days
      Ontario                                      for upgrade. Refinery to
                                                   operate at 60 percent of
                                                   capacity. Units started up by
                                                   Nov. 26 and refinery ramping
                                                   up to full rates. Refinery was
                                                   at reduced rates as of Jan.
                                                   22. Diesel production was down
                                                   by 30 percent.
                                                  
      Exxon Mobil     Aug. 20   Partial  155,800   Planned maintenance for 2
      Torrance,                                    months on the 155,800
      California                                   barrel-a-day crude unit,
                                                   27,300 barrel-a-day coker
                                                   unit, 24,000 barrel-a-day
                                                   pretreater, 19,000
                                                   barrel-a-day reformer. All
                                                   units except crude unit
                                                   restarted by Oct. 16. Crude
                                                   unit started up by Oct. 22. 
                                                  
      Valero Port     Aug. 16   Partial  265,000   Shut 105,000 barrel-a-day
      Arthur, Texas                                coker unit and number 2 crude
                                                   unit. Coker brought to 80,000
                                                   barrels a day rate by Sept. 5.
                                                   Crude unit restarted. Refinery
                                                   operating at 80 percent
                                                   capacity.
                                                  
      Chevron         Aug. 16   Partial  330,000   No. 2 crude unit shut after
      Pascagoula,                                  fire. Refinery is at 50
      Mississippi                                  percent of capacity. Two
                                                   reformers were started up by
                                                   Aug. 28. Repairs to be
                                                   completed by first quarter
                                                   2008.
                                                  
      Coffeyville     July 1    Full     108,000   Refinery shut after flood.
      Kansas                                       Most units restored by Aug.
                                                   17. Sulfur recovery unit and
                                                   hydrotreater still down.

      Second Quarter 2007

      BP Whiting,    April      Partial  405,000   Two crude units shut after
      Indiana                                      power failure, fire. Cat-feed
                                                   hydrotreater also shut. One
                                                   unit returned to service.
                                                   Hydrotreater started up by
                                                   Dec. 3. A 75,000 barrel-a-day
                                                   unit started up by Dec. 19.

      First Quarter 2007

      Valero McKee,  Feb. 16    Full     170,000   Plant shut after fire. Propane
      Texas                                        deasphalter is only unit still
                                                   down. Units restart scheduled
                                                   for end of January 2008.

      *T

      –Editor: Bill Banker,

      To contact the reporter on this story:
      Robert Tuttle in New York at +1-212-617-3465 or
      rtuttle@bloomberg.net

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum