Outage level measurement post delta valve installation

Home Forums co-forum Cutting, Drilling, Unheading Unheading Outage level measurement post delta valve installation

Viewing 0 reply threads
  • Author
    Posts
    • #46992
      Tina Lindell
      Participant

      Currently at our facility, coker drum outages are measured via tape through the top nozzle before coke cutting.  With the installation of top drum delta valves in the near future, coke drum measurements via tape through the top nozzle will no longer be possible.  I would really appreciate hearing how other facilities who have installed top delta valves take their outage measurements prior to coke cutting.  Thanks.
       
       