Does anyone experiencing the problem in performing the final drum checks after the cutting because of retrofitted DeltaValve. We have retrofit our drums with an incorporation of transition spool piece to accommodate the Delta Valve but since we donot have one solid drum the resonance effect that Operators were using before to confirm the drum cleanliness after cutting is no longer effective.