      ~ Consider running between TAR’s with only spalling though a proactive approach

      – EOR = 1175-1200degF
      – 5 years between pigging

      ~ Delta Valve Info

      – During an emergency shutdown, stagnant cooling water froze in the Delta Valve cooling box causing a bulge in the covers.
      – Two instances of transition spool leakage at bottom flange face

      ~ Furnace Fouling

      – Skin TI’s, Delta P

      ~ Reasons

      – Feedstock CCR, Aromaticity, Salt
      – Furnace Hot Spot, Flame Impingement, less XS02
      – Process Low Velocity

      ~ Mitigation

      – Chemicals
      – CZ Alonizing – Inside
      – Recycle
      – Velocity Steam
      – Metallurgy
      – Furnace Design
      – Preheat
      – Outside Coating – Outside

      ~ No technology for venting

      – Getting everyone away from the structure on a routine basis (unheading, cutting, switching)

      ~ Lowering pressure during venting of the drum

      – EPA driven
      – Options:
      – Install liquid ring compressor
      – Install injector

      ~ Foaming/Anti-foaming Injection

      – Injection point 180 degrees from vapor outlet
      – Carrier is HGO and LGO
      – Throttle to hold pressure
      – Standard outage one drum diameter

      ~ Minimum coking time

      – 4 – 6 hours in the drum
      – Achieve minimum temp of 910 to 920 for 30 minutes
      – Restart coking process
      – If too soon into drum, quench and drill

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum