Process

Viewing 0 reply threads
  • Author
    Posts
    • #3383
      Anonymous
      Guest

      Process Day 1 ~ Coke drum dual inlets vs single inlets                – Suncor blowouts & Doubling, Drains, Multiple inlets, single inlet orientation, hot spot / single entry, Default Dual entry~ Quenching procedures Hot Spots                – Double Drains, Suncor checks / Quench, COP adjusted quench, Press Draining, Quench water ramping program, Enclosed shroud~ Chloride deposited on top fractionator                – Suncor syncrude, Dispersant, Hydrolysis/Corrosion, CNRL 290-300F Frac Ovhd, Incl Water Wash, downstream implications~ Foaming Issues~ Reducing Cycle Times  Process Day 2 ~ Coke Fines                – Cone bottom constant drain.                – Fines management preventive maintenance.                – Corrosion dispersant; moves NH3CL to first liquid draw.                 – Drum purge – 3 volumes of drum.~ Water wash gas prior to amine scrub.                – Vent gas most vs liquid ring pumps.~ Filters                – Spare capacity size for expected capacity
               – Steam cleaning back flush

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum