Safety

Viewing 0 reply threads
  • Author
    Posts
    • #47051
      Anonymous
      Guest

      ~ Steam Generation in Decoking    – Managing feed stock    – Access management (blue lights, barricade)    – Manage inlet drum temperature~ Egress    – All structures egress on opposite ends    – Smaller structures stand off egress    – Fire protection both passive and active    – Safe passage to egress~ Power loss    – Back up for quench or method to keep channels open    – Procedure for back up quench failure~ Elevators – Vendor    – Reliability    – Correct size and load limit    – What to do in an emergency/failure~ Un-heading top and bottom head    – Risk analysis to determine installation of top head valves    – Top head automation    – Use drill stem for checking outage

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum