~ Steam Generation in Decoking – Managing feed stock – Access management (blue lights, barricade) – Manage inlet drum temperature~ Egress – All structures egress on opposite ends – Smaller structures stand off egress – Fire protection both passive and active – Safe passage to egress~ Power loss – Back up for quench or method to keep channels open – Procedure for back up quench failure~ Elevators – Vendor – Reliability – Correct size and load limit – What to do in an emergency/failure~ Un-heading top and bottom head – Risk analysis to determine installation of top head valves – Top head automation – Use drill stem for checking outage