      1. Coke dust containment
         a. Closed system as per MiRO
             i. Open system
                 1. High walls
                 2. No wind
                 3. Sprinklers
                 4. CO/S2 Monitors
                 5. Move Coke out quickly
      2. Low pressure emmissions
         a. Draw down pressure with compressors
         b. several methods to reduce pressure in drum
      3. Drum/Containment
         a. hazard, opening vents/drains on active drum
         b. hazard, opening feed isolation/hydro-carbon when open
      4. Solutions
         a. operator error
         b. operating interlocks
         c. training
         d. remove operator from harms way
      5. Training
         a. hands on at a facility
         b. commissioning
         c. lessons learned from design and operations
         d. outside/inside incidents to be summarized and learned from

      1. safety audit-LOPA (Layer of Protection Analysis)
      2. vendor training, site supervision during install, utilizing vendor websites and FAQs.
      3. rigorous management of change procedures
      4. more layers of protection/interlocks
      5. regular review of procedure by operators
      6. user groups bracket operations/engineering/project/design

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum