Syncrude Operating 2/3 Capacity Due Fluid Coker Fire

Home Forums Coking News: DCU, Upgrader 3.Upgrader (registered users only) Syncrude Operating 2/3 Capacity Due Fluid Coker Fire

Viewing 0 reply threads
  • Author
    Posts
    • #1918
      basil parmesan
      Participant

      Syncrude Operating At Two-Thirds Capacity After Coker FirePublished March 05, 2012 Dow Jones Newswires

      CALGARY The Syncrude oil-sands project in northeastern Alberta is operating at reduced capacity after a fire at its refinery, a spokeswoman for the project’s largest stakeholder said Monday.

      A fire late Friday at one of three coking units at the Syncrude project will reduce Syncrude’s production to two-thirds of its normal capacity of 350,000 barrels of oil a day, said Siren Fisekci, a spokeswoman for Canadian Oil Sands Ltd. (COS.T).

      There is no word yet on when the coker will be restarted, or what caused the damage, Fisekci said.
      Syncrude is a joint venture operated by Imperial Oil Ltd. (IMO). The other stakeholders are Suncor Energy Inc. (SU), China Petroleum & Chemical Corp. (600028.SH), Nexen Inc. (NXY), Murphy Oil Corp. (MUR) and Mocal Energy Ltd

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum