      North American Planned, Unplanned Refinery Shutdowns (Table)

      By Robert Tuttle
           February 12,2009 (Bloomberg)
      — Following is a table of scheduled and unplanned
      refinery shutdowns, maintenance, new plants and capacity expansions in North
      America. The list only includes work that could be confirmed.

           Shutdown Type: P: Planned, U: Unplanned, N: Non-maintenance

      Refinery                                     Refinery                          
      Owner                  Shutdown              Capacity                          
      Location                 Type    Period        b/d     Notes                   
      ——————————————————————————–
      New Information:
      Citgo Corpus Christi       U     Feb 11, 09   156,000  Platformer No. 4 shuts  
      Petroleos de                       to                  because of leak in line 
      Venezuela SA                     Feb, 09               to unit.                
      Texas, U.S.                                                                    

      Current Outages:Citgo Corpus Christi       U     Feb 11, 09   156,000  Platformer No. 4 shuts  
      Petroleos de                       to                  because of leak in line 
      Venezuela SA                     Feb, 09               to unit.                
      Texas, U.S.                                                                    

      Calumet Specialty          N     Feb 10, 09    42,000  Full shutdown after power
      Prods Cotton Valley                to                  failure. Restoration of 
      LA                               Feb, 09               power supply planned for
      Calumet Specialty                                      Feb. 11.                
      Products Partners LP                                                           
      Louisiana, U.S.                                                                

      Sunoco Philadelphia        P     Feb 05, 09   330,000  Hydroesulfurization unit
      Sunoco Inc                         to                  shuts for maintenance.  
      Pennsylvania, U.S.               Feb, 09                                       

      Marathon Texas City        P     Feb 04, 09    72,000  Platformer, UDEX unit   
      Marathon Oil Corp,                 to                  shut for maintenance.   
      Ashland Inc                      Feb, 09                                       
      Texas, U.S.                                                                    

      Exxon Mobil Baton          P     Feb 02, 09   488,600  FCC shuts for 53-day    
      Rouge                              to                  maintenance.            
      Exxon Mobil Corp                 Apr 02, 09                                    
      Louisiana, U.S.                                                                

      PEMEX Cardenas             P     Feb 02, 09   190,000  New units to expand     
      Minatitlan                         to                  capacity to 260,000 b/d 
      Petroleos Mexicanos              Feb 28, 09            scheduled to start in   
      Mexico                                                 February 2009.          

      Valero Benicia             P     Feb, 09      153,000  Hydrocracker, capacity  
      Valero Energy Corp                 to                  37,000 b/d, shuts for 14
      California, U.S.                 Feb, 09               day maintenance in      
                                                             February.               

      Sunoco Tulsa               P     Feb, 09       95,000  Partial turnaround in   
      Sunoco Inc                         to                  February 2009.          
      Oklahoma, U.S.                   Feb, 09            <CER – Expansion & Coker cancled>                           

      Big West Oil               N     Jan 28, 09    68,000  Full shutdown because of
      Bakersfield                        to                  bankruptcy filing.      
      Flying J Oil & Gas               N/A                                           
      Inc                                                                            
      California, U.S.                                                               

      Valero Texas City          P     Jan 28, 09   230,000  Full shutdown for 40 days
      Valero Energy Corp                 to                  for maintenance on CDU, 
      Texas, U.S.                      Mar 10, 09            VDU, coker. Maintenance 
                                                             delayed from 2008 because
                                                             of Hurricane Ike.       

      Petro-Canada Edmonton      U     Jan 27, 09   135,000  Naphtha hydrotreater unit
      Petro-Canada                       to                  damaged by explosion,   
      Alberta, Canada                  Feb, 09               fire. No timeframe for  
                                                             restart.                

      Conoco Sweeny              P     Jan 20, 09   260,000  FCC No. 3 shuts for     
      Petroleos de                       to                  maintenance.            
      Venezuela SA,                    Feb, 09                                       
      ConocoPhillips                                                                 
      Texas, U.S.                                                                    

      Holly Woods Cross          P     Jan 19, 09    26,000  Full shutdown for       
      Holly Corp                         to                  maintenance.            
      Utah, U.S.                       Feb 19, 09                                    

      ConocoPhillips             P     Jan 15, 09   247,000  Turnaround for weeks of 
      Alliance                           to                  maintenance.            
      ConocoPhillips                   Feb, 09                                       
      Louisiana, U.S.                                                                

      Tesoro Anacortes           P     Jan 15, 09   115,000  Full shutdown for 30 days
      Tesoro Corp                        to                  starting in mid-January.
      Washington, U.S.                 Feb, 09                                       

      Valero Corpus Christi      P     Jan 15, 09   110,000  FCC, capacity 93,000 b/d,
      East                               to                  and alkylation units shut
      Valero Energy Corp               Feb 15, 09            for maintenance.        
      Texas, U.S.                                                                    

      Chevron El Segundo         P     Jan 05, 09   260,000  FCC shuts for major     
      Chevron Corp                       to                  repairs.                
      California, U.S.                 Feb 15, 09                                    

      Valero Krotz Springs       P     Qtr 1, 09     83,100  Full turnaround planned 
      Alon USA Energy Inc                to                  for 2009.               
      Louisiana, U.S.                  Qtr 4, 09                                     

      Conoco Borger              P     Qtr 1, 09    146,000  New capacity,           
      ConocoPhillips,                    to                  debottlenecking to add  
      EnCana Corp                      Qtr 4, 09             20,000 b/d bitumen      
      Texas, U.S.                                            capacity.               

      Valero Benicia             P     Qtr 1, 09    153,000  Full shutdown scheduled 
      Valero Energy Corp                 to                  for 2009 in five-year   
      California, U.S.                 Qtr 4, 09             cycle of maintenance.   

      Exxon Mobil Torrance       P     Dec 30, 08   155,000  FCC, alkylation,        
      Exxon Mobil Corp                   to                  hydrotreater units shut 
      California, U.S.                 Feb 12, 09            for maintenance.        

      Petro Star Valdez          U     Dec 28, 08    50,000  Full shutdown after fire Artic Slope Regional               to                 at refinery, which      
      Corp                             N/A                   produces jet fuel, marine
      Alaska, U.S.                                           diesel and heating oil. 

      Delek LaGloria             U     Nov 20, 08    58,000  Full shutdown after      Delek US Holdings Inc              to                  explosion in saturated  
      Texas, U.S.                      May, 09               gas unit for naphtha    
                                                             hydrotreater. Restart   
                                                             planned for May 2009.   

      Future Outages:

      Shell Anacortes            P     Feb 27, 09   145,000  Major five-week         
      Royal Dutch Shell PLC              to                  turnaround to reduce fuel
      Washington, U.S.                 Apr 04, 09            supply.                 

      Frontier Cheyenne          P     Mar, 09       52,000  FCC shuts for two week  
      Frontier Oil Corp                  to                  maintenance in March.   
      Wyoming, U.S.                    Mar, 09                                       

      Suncor Commerce City       P     Mar, 09       62,000  CDU, reformer shut for  
      Suncor Energy Inc                  to                  maintenance.            
      Colorado, U.S.                   Mar, 09                                       

      Valero Paulsboro           P     Apr, 09      195,000  Coker, capacity 27,000  
      Valero Energy Corp                 to                  b/d, shuts for 35 days in
      New Jersey, U.S.                 May, 09               April and May.          

      North Atlantic N           P     Qtr 2, 09    105,000  CDU, hydrocracker shut  
      Atlantic                           to                  for maintenance in 2Q   
      Harvest Energy Trust             Qtr 2, 09             2009.                   
      Newfoundland and                                                               
      Labrador, Canada                                                               

      Sunoco Philadelphia        P     Jun, 09      330,000  New Hydrotreater        
      Sunoco Inc                         to                  conversion project, unit
      Pennsylvania, U.S.               Jul, 09               to start operations in  
                                                             mid 2009, upgrading     
                                                             45,000 b/d of product   
                                                             into ultra-low sulfur   
                                                             diesel.                 

      Alon Big Spring            P     Qtr 3, 09     70,000  Alkylation unit repairs 
      Alon Israel Oil Co                 to                  planned in third quarter
      Ltd                              Qtr 3, 09             to restore normal       
      Texas, U.S.                                            operations after 2008   
                                                             fire.                   

      Western Refining           P     Qtr 3, 09     61,900  Turnaround scheduled for Yorktown                           to                  third quarter 2009, no  
      Western Refining Inc             Qtr 3, 09             more specific details   
      Virginia, U.S.                                         available.              

      Marathon Canton            P     Qtr 3, 09     73,000  New distillate          
      Marathon Oil Corp,                 to                  hydrotreater, capacity  
      Ashland Inc                      Qtr 4, 09             19,000 b/d, to be       
      Ohio, U.S.                                             completed in late 2009 to
                                                             produce 15 ppm diesel.  

      BP Texas City              P     Sep 08, 09   470,000  FCCU No. 3 shuts for    
      BP PLC                             to                  turnaround.             
      Texas, U.S.                      Oct 01, 09                                    

      Frontier El Dorado         P     Oct, 09      112,000  FCC shuts for 30 days in
      Frontier Oil Corp                  to                  October-November.       
      Kansas, U.S.                     Nov, 09                                       

      Marathon Garyville         P     Qtr 4, 09    275,000  New CDU, VDU,           
      Marathon Oil Corp,                 to                  hydrocracker (capacity  
      Ashland Inc                      Qtr 4, 09             70,000 b/d), delayed    
      Louisiana, U.S.                                        coker (44,000 b/d),     
                                                             reformer (65,000 b/d),  
                                                             kerosene hydrotreater   
                                                             (47,000) planned to come on line,
                                                             raising refinery throughput to 425,000 
      barrels a day.          

      Sunoco Tulsa               N     Dec 31, 09    95,000  Full shutdown of refinery
      Sunoco Inc                         to                  planned by end of 2009 if
      Oklahoma, U.S.                   Dec 31, 09            unit cannot be sold, and
                                                             Sunoco will convert plant into a terminal. 
             

      Conoco Wood River          P     Qtr 1, 10    306,000  New Coker, 65,000 b/d   
      EnCana Corp,                       to                  capacity, scheduled to  
      ConocoPhillips                   Qtr 4, 10             come on stream in 2010. 
      Illinois, U.S.                                         Refinery capacity to    
                                                             increase to 360,000 b/d.
      Flint Hills Corpus         P     Qtr 1, 10    300,000  New diesel dsulfurization
      Christi                            to                  unit and sulfur recovery
      Koch Industries Inc              Qtr 1, 10             plant planned to be     
      Texas, U.S.                                            completed early 2010.   

      Valero Norco St            P     Qtr 1, 10    250,000  New CDU expansion to add
      Charles                            to                  45,000 b/d crude capacity,       
      Valero Energy Corp               Qtr 1, 10       10,000 b/d coking to start   
      Louisiana, U.S.                                    in first quarter 2010. Had been 
                                                             planned for third quarter 2009.                   

      Valero Benicia             P     Qtr 1, 10    153,000  New units to expand CDU 
      Valero Energy Corp                 to                  capacity 25% to daily   
      California, U.S.                 Qtr 4, 10             runs of 180,000 b/d,    
                                                             coker by 25%, SRU by 50%
                                                             to handle heavier crudes,
                                                             reduce gasoil imports and
                                                             expand gasoline output. 

      Placid Port Allen          P     Qtr 1, 10     57,000  New FCC, units to expand
      Placid Refining Co                 to                  capacity to 80,000      
      LLC                              Qtr 4, 10             barrels a day scheduled 
      Louisiana, U.S.                                        to be completed in 2010.

      Chevron Richmond           P     Qtr 1, 10    257,200  New Hydrogen plant,     
      Chevron Corp                       to                  reforming units to      
      California, U.S.                 Qtr 4, 10             improve crude feedstock 
                                                             flexibility scheduled to
                                                             start in 2010. No change
                                                             to refinery capacity.   

      Farmland Coffeyville       P     Qtr 1, 10    115,000  Full turnaround scheduled
      CVR Energy Inc                     to                  for 2010, in cycle of   
      Kansas, U.S.                     Qtr 4, 10             every three to four     
                                                             years. Last event was   
                                                             Feb-April 2007.         

      Pasadena                   P     Qtr 1, 10    106,500  New units to double     
      Nationale A                        to                  capacity to 200,000     
      Portefeuille                     Qtr 4, 10             barrels a day planned to
      Texas, U.S.                                            start in 2010.          

      Motiva Port Arthur         P     Qtr 1, 10    285,000  New units to add 325,000
      Motiva Enterprises                 to                  b/d crude capacity, to  
      LLC                              Qtr 4, 10             start in 2010.          
      Texas, U.S.                                                                    

      Valero Norco St            P     Qtr 2, 10    250,000  FCC expansion to increase
      Charles                            to                  output by 5 percent     
      Valero Energy Corp               Qtr 2, 10             scheduled to start.     
      Louisiana, U.S.                                                                

      Chevron Pascagoula         P     Qtr 2, 10    330,000  New Platformer/CCR unit 
      Chevron Corp                       to                  to start output in      
      Mississippi, U.S.                Qtr 3, 10             mid-2010, to increase   
                                                             gasoline output 10%, or 
                                                             600,000 gallons a day.  

      Exxon Mobil Baytown        P     Qtr 3, 10    563,000  New Desulfurization unit
      Exxon Mobil Corp                   to                  to raise diesel output to
      Texas, U.S.                      Qtr 4, 10             start output by end 2010.

      Exxon Mobil Baton          P     Qtr 3, 10    488,600  New Desulfurization unit
      Rouge                              to                  to raise diesel output to
      Exxon Mobil Corp                 Qtr 4, 10             start output by end 2010.
      Louisiana, U.S.                                                                

      Sinclair Tulsa             P     Qtr 4, 10     60,000  New CDU, hydrocracker,  
      Sinclair Oil Corp                  to                  coker units planned to  
      Oklahoma, U.S.                   Qtr 4, 10      start operations. Capacity to        
                                                            increase to 115,000 barrels a day.  

      Total Port Arthur          P     Qtr 1, 11    240,000  New Coker (50,000 b/d), 
      Total SA                           to                  desulfurization and     
      Texas, U.S.                      Qtr 4, 11             vacuum distillation unit.
                                                             The $2.2 billion project is scheduled 
                                                             to be completed in 2011.      

      Valero Port Arthur         P     Qtr 2, 11    325,000  New Coker construction to
      Valero Energy Corp                 to                  be completed, capacity  
      Texas, U.S.                      Qtr 2, 11             45,000 barrels a day,   
                                                             during 2Q of 2011. Refinery throughput      
                                                             to rise to 415,000 b/d in conjunction   
                                                             with related investments. PROJECT    
                                                             SHELVED IN OCT 2008.
          

      Valero Port Arthur         P     Qtr 3, 11    325,000  New Hydrocracker        
      Valero Energy Corp                 to                  construction to be      
      Texas, U.S.                      Qtr 3, 11             completed, capacity     
                                                             50,000 barrels a day, to start
                                                             in third quarter 2011. Crude expansion   
                                                             unlocks 75,000 b/d existing capacity. Had  
                                                             been scheduled for 4th quarter 2010
      .           

      BP Whiting                 P     Qtr 4, 11    420,000  New Coker, capacity     
      BP PLC                             to                  120,000 b/d, along with 
      Indiana, U.S.                    Qtr 4, 11             related units to process
                                                             Canadian heavy oil scheduled to begin      
                                                             service in late 2011.   

      Valero Memphis             P     Qtr 1, 12    190,000  FCC revamp planned for  
      Valero Energy Corp                 to                  2012, delayed from 2009.
      Tennessee, U.S.                  Qtr 4, 12                                     

      Consumers’ Co-op           P     Jan, 12      100,000  New CDU expansion to add
      Regina                             to                  30,000 b/d capacity to a
      Federated                        Dec, 12               total 130,000 b/d, also 
      Co-operative Ltd                                       add FCC complex, planned
      Saskatchewan, Canada                               to start operations in 2012.                   

      Valero Quebec City         P     Qtr 1, 12    215,000  New Hydrocracker,       
      Valero Energy Corp                 to                  de-asphalting units     
      Quebec, Canada                   Qtr 4, 12             planned for 2012 startup.

      Conoco Borger              P     Qtr 1, 12    146,000  New units to expand crude
      ConocoPhillips,                    to                  distillation to 200,000 
      EnCana Corp                      Qtr 4, 12             b/d, with 75,000 b/d    
      Texas, U.S.                                            bitumen capacity.       

      Marathon Detroit           P     Qtr 2, 12    100,000  New Coker, capacity     
      Marathon Oil Corp,                 to                  28,000 b/d, scheduled to
      Ashland Inc                      Qtr 3, 12             enter service, along with
      Michigan, U.S.                                         sulfur recovery unit (280 long
                                                             tons/day), distillate hydrotreater 
                                                             (33,000 b/d) and hydrogen plant.
                                                            Nameplate capacity of refinery to increase 
                                                             to 115,000 b/d. Completion delayed in   
                                                             Feb. 2009 to mid-2012 from original plan 2010
      .                   

      Valero Norco St            P     Qtr 4, 12    250,000  New Hydrocracker,       
      Charles                            to                  capacity 50,000 b/d,    
      Valero Energy Corp               Qtr 4, 12      planned to enter service in
      Louisiana, U.S.                                      fourth quarter 2012. This project 
                                                             delayed from 2010 startup.           

      Historical Outages:

      Valero Corpus Christi      P     Feb 03, 09   110,000  CDU, VDU shut for two-day
      East                               to                  maintenance. Restart    
      Valero Energy Corp               Feb 05, 09            confirmed.              
      Texas, U.S.                                                                    

      Valero Port Arthur         U     Jan 27, 09   325,000  Hydrocracker shuts to   
      Valero Energy Corp                 to                  repair a leak. Restart  
      Texas, U.S.                      Feb 02, 09            confirmed.              

      Exxon Mobil Baytown        U     Jan 26, 09   563,000  FCC unit upset curbs    
      Exxon Mobil Corp                   to                  production.             
      Texas, U.S.                      Jan 29, 09                                    

      Conoco Bayway Linden       U     Jan 20, 09   238,000  FCC shuts for repairs.  
      ConocoPhillips                     to                                          
      New Jersey, U.S.                 Feb, 09                                       

      Shell Deer Park            U     Jan 18, 09   340,000  CDU rates cut because of
      Royal Dutch Shell                  to                  leak.                   
      PLC, Petroleos                   Jan 23, 09                                    
      Mexicanos                                                                      
      Texas, U.S.                                                                    

      Tesoro Wilmington          P     Jan 18, 09   100,000  Hydrotreater shuts for  
      Tesoro Corp                        to                  maintenance.            
      California, U.S.                 Jan 20, 09                                    

      Husky Prince George        N     Jan 16, 09    10,000  Full shutdown after power
      Husky Energy Inc                   to                  cut. Restart confirmed. 
      British Columbia,                Jan 19, 09                                    
      Canada                                                                         

      BP Carson                  P     Jan, 09      265,500  Jet-fuel hydrotreater   
      BP PLC                             to                  restarts after repair.  
      California, U.S.                 Feb 03, 09                                    

      Big West Oil               P     Jan 15, 09    68,000  Runs cut by turnaround. 
      Bakersfield                        to                  Additional details not  
      Flying J Oil & Gas               Jan 28, 09            available. Refinery not 
      Inc                                                    processing crude after  
      California, U.S.                                       bankruptcy filing, only 
                                                             making diesel.          

      BP Carson                  P     Jan 12, 09   265,500  Reformer, one of two at 
      BP PLC                             to                  the refinery, shut for  
      California, U.S.                 Jan, 09               repairs.                

      Silver Eagle Woods         U     Jan 12, 09    10,250  Runs cut after explosion
      Cross                              to                  in tank farm. Runs began ramping
      Silver Eagle Refining            Jan, 09          back up the next day.
      Utah, U.S.                                                                

      Alon Big Spring            U     Jan 11, 09    70,000  FCC runs cut because of 
      Alon Israel Oil Co                 to                  tube leak. Full rates   
      Ltd                              Jan 16, 09            confirmed.              
      Texas, U.S.                                                                    

      BP Texas City              U     Jan 06, 09   470,000  Reformer shut because of
      BP PLC                             to                  tube leak.              
      Texas, U.S.                      Jan 13, 09                                    

      Shell Deer Park            P     Jan 05, 09   340,000  CDU, FCC, Hydrocracker, 
      Royal Dutch Shell                  to                  coker, platformer,      
      PLC, Petroleos                   Jan 26, 09            hydrodesulfurization,   
      Mexicanos                                              Sulfur Recovery Units No.
      Texas, U.S.                                            6 and No. 7 and hydrogen
                                                             plant maintenance for 3 weeks    
                                                             will reduce crude runs.           

      Navajo Artesia             P     Jan, 09       75,000  New hydrocracker,       
      Holly Corp                         to                  capacity 15,000 barrels a
      New Mexico, U.S.                 Jan, 09               day, expected to start  
                                                             production. Turnaround  
                                                             planned.                

      Murphy Meraux              P     Jan, 09      125,000  Alkylation unit shuts for
      Murphy Oil Corp                    to                  16-day maintenance.     
      Louisiana, U.S.                  Jan, 09                                       

      Sunoco Philadelphia        P     Jan 02, 09   330,000  Hydrotreater shut for   
      Sunoco Inc                         to                  maintenance.            
      Pennsylvania, U.S.               Jan, 09                                       

      Big West Oil               P     Dec 30, 08    68,000  Full shutdown for       
      Bakersfield                        to                  hydrocracker maintenance,
      Flying J Oil & Gas               Jan 15, 09            10-day catalyst change. 
      Inc                                                                            
      California, U.S.                                                               

      Cenex Laurel               U     Dec 25, 08    55,000  Diesel hydrotreater shut
      CHS Inc                            to                  by fire. Restart        
      Montana, U.S.                    Jan 22, 09            confirmed.              

      Conoco Billings            U     Dec 25, 08    58,000  Gasoline production cut 
      ConocoPhillips                     to                  by fire. Repairs        
      Montana, U.S.                    Jan 08, 09            estimated to take two   
                                                             weeks.                  

      Citgo Corpus Christi       U     Dec 21, 08   156,000  Runs cut after fire in  
      Petroleos de                       to                  sulfur recovery unit.   
      Venezuela SA                     Dec, 08                                       
      Texas, U.S.                                                                    

      Total Port Arthur          P     Dec 18, 08   240,000  Gas condensate splitter 
      Total SA                           to                  shuts for a month.      
      Texas, U.S.                      Jan 19, 09                                    

      Valero Corpus Christi      N     Dec 18, 08   110,000  Full shutdown because of
      East                               to                  power failure.          
      Valero Energy Corp               Dec 21, 08                                    
      Texas, U.S.                                                                    

      Paramount                  P     Dec 15, 08    55,000  Full shutdown and       
      Alon USA Energy Inc                to                  hydrocracker startup to 
      California, U.S.                 Feb 05, 09            increase gasoline, diesel
                                                             output by 50 percent.   
                                                             Startup began Feb. 5.   

      Holly Woods Cross          P     Dec 15, 08    26,000  Hydrocracker, capacity  
      Holly Corp                         to                  15,000 barrels a day,   
      Utah, U.S.                       Dec, 08               starts production. Crude
                                                             refining capacity rises 
                                                             to 31,000 barrels a day.

      BP Texas City              U     Dec 15, 08   470,000  Hydrpocracker shut for  
      BP PLC                             to                  repairs. Restart        
      Texas, U.S.                      Dec 18, 08            confirmed.              

      BP Texas City              P     Dec 15, 08   470,000  Hydrocracker shuts for  
      BP PLC                             to                  maintenance.            
      Texas, U.S.                      Dec 17, 08                                    

      BP Carson                  N     Dec 14, 08   265,500  FCC shuts because of a  
      BP PLC                             to                  malfunction. Restart    
      California, U.S.                 Jan 06, 09            began Jan. 5.           

      Valero Norco St            U     Dec 14, 08   250,000  FCC shuts for unplanned 
      Charles                            to                  repairs. Restart        
      Valero Energy Corp               Jan 06, 09            confirmed.              
      Louisiana, U.S.                                                                

      Citgo Corpus Christi       U     Dec 10, 08   156,000  Platformer repairs to fix
      Petroleos de                       to                  steam leaks.            
      Venezuela SA                     Dec, 08                                       
      Texas, U.S.                                                                    

      Valero Corpus Christi      N     Dec 10, 08   110,000  CDU, hydrocracker shut by
      East                               to                  power cut.              
      Valero Energy Corp               Dec 12, 08                                    
      Texas, U.S.                                                                    

      Valero Corpus Christi      U     Dec 02, 08   110,000  Hydrocracker, capacity  
      East                               to                  36,000 b/d, shut for    
      Valero Energy Corp               Dec 09, 08            repairs.                
      Texas, U.S.                                                                    

      Valero Paulsboro           P     Dec 01, 08   195,000  FCC shut for repairs.   
      Valero Energy Corp                 to                  Outage extended because 
      New Jersey, U.S.                 Dec 31, 08            of low margins. Restart 
                                                             confirmed.              

      Exxon Mobil Torrance       U     Dec 01, 08   155,000  Runs cut by unspecified 
      Exxon Mobil Corp                   to                  outage.                 
      California, U.S.                 Dec, 08                                       

      Tesoro Wilmington          N     Nov 25, 08   100,000  Catalytic reformers shut.
      Tesoro Corp                        to                                          
      California, U.S.                 Dec, 08                                       

      BP Texas City              U     Nov 23, 08   470,000  Hydrocracker shuts for  
      BP PLC                             to                  repairs.                
      Texas, U.S.                      Nov 25, 08                                    

      Tesoro Wilmington          U     Nov 21, 08   100,000  Runs cut after fault on 
      Tesoro Corp                        to                  crude unit. Restart     
      California, U.S.                 Nov 24, 08            confirmed.              

      Western Refining El        P     Nov 13, 08   122,000  CDU, reformer, diesel   
      Paso                               to                  hydrotreater maintenace 
      Western Refining Inc             Dec 11, 08            starts Nov. 13, brought 
      Texas, U.S.                                            forward from January.   
                                                             Shutdown is 28 days.    

      Valero Houston             U     Nov 11, 08    90,000  FCC shuts after         
      Valero Energy Corp                 to                  compressor malfunction. 
      Texas, U.S.                      Nov 15, 08            Restart confirmed.      

      Conoco Borger              U     Nov 11, 08   146,000  Runs cut by unplanned CDU
      ConocoPhillips,                    to                  repairs.                
      EnCana Corp                      Nov 14, 08                                    
      Texas, U.S.                                                                    

      Petrojam                   N     Nov 09, 08    36,000  Runs cut to 25,000 b/d  
      Petroleum Corp of                  to                  after a CDU leak.       
      Jamaica                          Nov, 08                                       
      Jamaica                                                                        

      Valero Port Arthur         U     Nov 07, 08   325,000  Hydrocracker shuts for  
      Valero Energy Corp                 to                  leak.                   
      Texas, U.S.                      Nov 11, 08                                    

      Irving Saint John          P     Nov 06, 08   300,000  CDU No. 3, diesel       
      Irving Oil Corp                    to                  hydrotreater, sulfur    
      Newfoundland and                 Dec 03, 08            plant shut for          
      Labrador, Canada                                       maintenance. Restart    
                                                             confirmed.              

      Valero Delaware City       P     Nov 04, 08   190,200  CDU, capacity 180,000   
      Valero Energy Corp                 to                  b/d, shuts for 25 day   
      Delaware, U.S.                   Dec 12, 08            maintenance in November,
                                                             FCC shuts for 15 days.  
                                                             This was delayed from   
                                                             October.                

      Conoco Borger              P     Nov 04, 08   146,000  FCC maintenance on      
      ConocoPhillips,                    to                  electrostatic           
      EnCana Corp                      Nov 18, 08            precipitators.          
      Texas, U.S.                                                                    

      Marathon Texas City        U     Nov 03, 08    72,000  CDU, capacity 52,000 b/d,
      Marathon Oil Corp,                 to                  shuts after fire. Restart
      Ashland Inc                      Nov 18, 08            confirmed.              
      Texas, U.S.                                                                    

      Imperial Oil Sarnia        P     Oct 30, 08   121,000  Runs cut by partial     
      Exxon Mobil Corp                   to                  turnaround at main units.
      Ontario, Canada                  Nov 30, 08            More specific details not disclosed.              

      Valero Paulsboro           U     Oct 30, 08   195,000  FCC shuts because of    
      Valero Energy Corp                 to                  upset. Restart confirmed.
      New Jersey, U.S.                 Nov 06, 08                                    

      Flint Hills Corpus         P     Oct 27, 08   300,000  FCC No. 2, SRU shut for 
      Christi                            to                  maintenance. Restart    
      Koch Industries Inc              Dec 03, 08            confirmed.              
      Texas, U.S.                                                                    

      Shell Canada Scotford      P     Oct 24, 08   100,000  Partial outage, unit shut
      Royal Dutch Shell PLC              to                  not identified.         
      Alberta, Canada                  Nov, 08                                       

      Pasadena                   P     Oct 24, 08   106,500  FCC shuts for           
      Nationale A                        to                  maintenance.            
      Portefeuille                     Oct, 08                                       
      Texas, U.S.                                                                    

      Marathon Texas City        U     Oct 23, 08    72,000  Partial outage,         
      Marathon Oil Corp,                 to                  unidentified unit shuts.
      Ashland Inc                      Oct, 08                                       
      Texas, U.S.                                                                    

      Valero Wilmington          P     Oct 22, 08   135,000  FCC shuts for repairs.  
      Valero Energy Corp                 to                  Restart confirmed.      
      California, U.S.                 Nov 03, 08                                    

      PEMEX Hidalgo Tula         P     Oct 21, 08   273,000  CDU, VDU shut for       
      Petroleos Mexicanos                to                  maintenance.            
      Mexico                           Nov 19, 08                                    

      Husky Lima                 P     Oct 18, 08   160,000  Hydrocracker shuts for  
      Husky Energy Inc                   to                  repair for three weeks. 
      Ohio, U.S.                       Nov 09, 08            Restart confirmed.      

      Hovensa St. Croix          N     Oct 15, 08   495,000  Full shutdown for       
      Petroleos de                       to                  Hurricane Omar. Restart 
      Venezuela SA, Hess               Oct 20, 08            began Oct. 16 and will  
      Corp                                                   take `several days’     
      US Virgin Islands,                                     according to the company.
      U.S.                                                                           

      Valero McKee               U     Oct 14, 08   164,000  FCC rates cut to minimum
      Valero Energy Corp                 to                  level on poewr cable    
      Texas, U.S.                      Oct, 08               failure.                

      Consumers’ Co-op           N     Oct, 08      100,000  Runs cut for unpsecified
      Regina                             to                  reason. Additional      
      Federated                        Oct, 08               details not disclosed.  
      Co-operative Ltd                                                               
      Saskatchewan, Canada                                                           

      Conoco Borger              P     Oct 06, 08   146,000  FCC repairs to          
      ConocoPhillips,                    to                  electrostatic           
      EnCana Corp                      Oct 16, 08            precipitators.          
      Texas, U.S.                                                                    

      Valero Three Rivers        P     Oct 03, 08    95,000  Hydrocracker shuts for 28
      Valero Energy Corp                 to                  days in October. Restart
      Texas, U.S.                      Nov 17, 08            confirmed.              

      Motiva Norco               P     Oct 03, 08   220,000  This planned turnaround 
      Saudi Arabian Oil Co,              to                  delayed to replenish fuel
      Royal Dutch Shell PLC            Nov 10, 08            inventory after Hurricane
      Louisiana, U.S.                                        Ike. FCC, capacity      
                                                             110,000 barrel-a-day, was
                                                             to shut for maintenance.

      Husky Lima                 N     Oct 03, 08   160,000  Runs cut 25,000 b/d after
      Husky Energy Inc                   to                  pipeline leak halted    
      Ohio, U.S.                       Oct 07, 08            crude supply. Refinery  
                                                             ramped up on Oct. 6 after pipeline repaired.      

      Petro-Canada Montreal      P     Qtr 4, 08    105,210  New coker, planned to be
      Petro-Canada                       to                  built by 2009, postponed
      Quebec, Canada                   Qtr 4, 08             indefinitely.           

      Farmland Coffeyville       P     Qtr 4, 08    115,000  Turnaround for          
      CVR Energy Inc                     to                  maintenance on nitrogen 
      Kansas, U.S.                     Qtr 4, 08             fertilizer. Event happens
                                                             every two years.        

      Valero Ardmore             P     Oct, 08       85,000  FCC shuts for 20 days and
      Valero Energy Corp                 to                  hydrocracker for 30 days
      Oklahoma, U.S.                   Nov 26, 08            during October and November. Restart confirmed.              

      BP Whiting                 P     Oct, 08      420,000  Coker shuts for         
      BP PLC                             to                  maintenance. Restart    
      Indiana, U.S.                    Nov 15, 08            confirmed.              

      Hovensa St. Croix          N     Oct, 08      495,000  FCC runs cut on weak    
      Petroleos de                       to                  margins. Duration of    
      Venezuela SA, Hess               Oct, 08               cuts, confirmed Oct. 29,
      Corp                                                   not disclosed.          
      US Virgin Islands,                                                             
      U.S.                                                                           

      Chevron Salt Lake          P     Oct, 08       45,000  Coker shuts for         
      City                               to                  maintenance. Restart    
      Chevron Corp                     Oct, 08               confirmed.              
      Utah, U.S.                                                                     

      Imperial Oil               P     Oct 01, 08   184,000  Diesel unit shuts for   
      Strathcona                         to                  maintenance. Restart    
      Exxon Mobil Corp                 Nov 03, 08            confirmed.              
      Alberta, Canada                                                                

      Valero Houston             U     Sep 30, 08    90,000  FCC shuts for unplanned 
      Valero Energy Corp                 to                  repairs after fault found
      Texas, U.S.                      Oct 20, 08            during restart because of
                                                             Hurricane Ike.          

      Exxon Mobil Torrance       P     Sep 29, 08   155,000  Coker, reformer, fuel   
      Exxon Mobil Corp                   to                  gas, pretreatment units 
      California, U.S.                 Nov 16, 08            shut for maintenance.   
                                                             Repairs delayed, restarted mid-November

      Murphy Meraux              P     Sep 15, 08   125,000  Turnaround for          
      Murphy Oil Corp                    to                  unidentified unit as of 
      Louisiana, U.S.                  Oct, 08               mid-September.          

      Valero Ardmore             N     Sep 15, 08    85,000  Runs cut on lack of crude
      Valero Energy Corp                 to                  supply after Hurricane  
      Oklahoma, U.S.                   Sep, 08               Ike.                    

      Exxon Mobil Baytown        P     Sep 13, 08   563,000  Flexicoker shut for     
      Exxon Mobil Corp                   to                  repairs. Restart        
      Texas, U.S.                      Nov 24, 08            confirmed.              

      Total Port Arthur          N     Sep 12, 08   240,000  Full shutdown for       
      Total SA                           to                  Hurricane Ike.          
      Texas, U.S.                      Oct, 08                                       

      Calcasieu Lake             N     Sep 12, 08    29,400  Full shutdown for       
      Charles                            to                  Hurricane Ike. Restart  
      Calcasieu Refining Co            Sep 17, 08            confirmed.              
      Louisiana, U.S.                                                                

      Chevron Burnaby            N     Sep 12, 08    55,000  FCC shut down for       
      Chevron Corp                       to                  maintenance after upset.
      British Columbia,                Sep 17, 08            Unit restarted.         
      Canada                                                                         

      Exxon Mobil Beaumont       N     Sep 11, 08   365,000  Full shutdown for       
      Exxon Mobil Corp                   to                  Hurricane Ike. Limited  
      Texas, U.S.                      Oct, 08               operations resumed.     

      Marathon Texas City        N     Sep 11, 08    72,000  Full shutdown for       
      Marathon Oil Corp,                 to                  Hurricane Ike. Restarted
      Ashland Inc                      Oct, 08               first week of October.  
      Texas, U.S.                                                                    

      Pasadena                   N     Sep 11, 08   106,500  Full shutdown for       
      Nationale A                        to                  Hurricane Ike.          
      Portefeuille                     Sep, 08                                       
      Texas, U.S.                                                                    

      BP Texas City              N     Sep 11, 08   470,000  Full shutdown for       
      BP PLC                             to                  Hurricane Ike.          
      Texas, U.S.                      Sep, 08                                       

      Valero Port Arthur         N     Sep 11, 08   325,000  Full shutdown for       
      Valero Energy Corp                 to                  Hurricane Ike.          
      Texas, U.S.                      Sep, 08                                       

      Motiva Port Arthur         N     Sep 11, 08   285,000  Full shutdown for       
      Motiva Enterprises                 to                  Hurricane Ike.          
      LLC                              Sep, 08                                       
      Texas, U.S.                                                                    

      Exxon Mobil Baytown        N     Sep 11, 08   563,000  Full shutdown for       
      Exxon Mobil Corp                   to                  Hurricane Ike.          
      Texas, U.S.                      Sep 19, 08                                    

      Valero Houston             N     Sep 11, 08    90,000  Full shutdown for       
      Valero Energy Corp                 to                  Hurricane Ike.          
      Texas, U.S.                      Sep 17, 08                                    

      Shell Deer Park            N     Sep 11, 08   340,000  Full shutdown for       
      Royal Dutch Shell                  to                  Hurricane Ike. Restart  
      PLC, Petroleos                   Sep 17, 08            confirmed.              
      Mexicanos                                                                      
      Texas, U.S.                                                                    

      Valero Texas City          N     Sep 11, 08   230,000  Full shutdown for       
      Valero Energy Corp                 to                  Hurricane Ike. Restart  
      Texas, U.S.                      Sep 17, 08            confirmed.              

      LyondellBasell             N     Sep 10, 08   287,000  Full shutdown for       
      Houston                            to                  Hurricane Ike. Restart  
      Access Industries                Sep 23, 08            confirmed.              
      Holdings LLC                                                                   
      Texas, U.S.                                                                    

      Conoco Sweeny              N     Sep 10, 08   260,000  Full shutdown for       
      Petroleos de                       to                  Hurricane Ike. Restart  
      Venezuela SA,                    Sep 16, 08            confirmed.              
      ConocoPhillips                                                                 
      Texas, U.S.                                                                    

      Conoco Bayway Linden       U     Sep 07, 08   238,000  Isomerization unit shut 
      ConocoPhillips                     to                  by fire. Extent of damage
      New Jersey, U.S.                 Sep, 08               not reported.           

      Calcasieu Lake             N     Sep 03, 08    29,400  Full shutdown for       
      Charles                            to                  Hurricane Gustav. Restart
      Calcasieu Refining Co            Sep 10, 08            confirmed.              
      Louisiana, U.S.                                                                

      PEMEX Hidalgo Tula         P     Sep, 08      273,000  FCC shuts for planned   
      Petroleos Mexicanos                to                  maintenance of up to 90 
      Mexico                           Dec, 08               days.                   

      Conoco Wood River          P     Qtr 3, 08    306,000  Catalytic cracker       
      EnCana Corp,                       to                  maintenance to install  
      ConocoPhillips                   Qtr 4, 08             wet-gas scrubbers to    
      Illinois, U.S.                                         reduce emissions.       

      BP Toledo                  P     Sep, 08      155,000  CDU, coker, alkylation  
      BP PLC                             to                  units shut for maintenance.         
      Ohio, U.S.                       Nov 17, 08        Restart confirmed.              

      Suncor Sarnia              P     Sep 02, 08    80,000  Hydrocracker, gasoline  
      Suncor Energy Inc                  to                  hydrotreater shut for   
      Ontario, Canada                  Oct 12, 08            maintenance.            

      PEMEX Cardenas             P     Sep, 08      190,000  Gasoline, diesel units  
      Minatitlan                         to                  shut for planned        
      Petroleos Mexicanos              Sep, 08               maintenance.            
      Mexico                                                                         

      Exxon Mobil Joliet         P     Sep 01, 08   240,000  FCC, alkylation units   
      Exxon Mobil Corp                   to                  shut for maintenance.   
      Illinois, U.S.                   Oct, 08               Restart confirmed Oct.  
                                                             14.                     

      Chevron Pascagoula         N     Sep 01, 08   330,000  Runs cut in connection  
      Chevron Corp                       to                  with Hurricane Gustav.  
      Mississippi, U.S.                Sep 05, 08                                    

      Exxon Mobil Baton          N     Aug 31, 08   488,600  Full shutdown for       
      Rouge                              to                  Hurricane Gustav. Restart
      Exxon Mobil Corp                 Sep 05, 08            confirmed.              
      Louisiana, U.S.                                                                

      ConocoPhillips             N     Aug 29, 08   247,000  Full shutdown for       
      Alliance                           to                  Hurricanes Gustav and   
      ConocoPhillips                   Sep 16, 08            Ike. Restart confirmed. 
      Louisiana, U.S.                                                                

      Chalmette LA               N     Aug 29, 08   184,000  Full shutdown for       
      Petroleos de                       to                  Hurricane Gustav.       
      Venezuela SA, Exxon              Sep, 08                                       
      Mobil Corp                                                                     
      Louisiana, U.S.                                                                

      Valero Krotz Springs       N     Aug 29, 08    83,100  Full shutdown for       
      Alon USA Energy Inc                to                  Hurricane Gustav. Restart
      Louisiana, U.S.                  Sep 08, 08            confirmed.              

      Total Port Arthur          P     Aug 29, 08   240,000  Full shutdown for       
      Total SA                           to                  Hurricane Gustav.       
      Texas, U.S.                      Sep 08, 08                                    

      Valero Texas City          N     Aug 29, 08   230,000  Runs cut for Hurricane  
      Valero Energy Corp                 to                  Gustav. Normal operations
      Texas, U.S.                      Sep 08, 08            resumed.                

      Valero Norco St            N     Aug 29, 08   250,000  Full shutdown for       
      Charles                            to                  Hurricane Gustav.       
      Valero Energy Corp               Sep 08, 08                                    
      Louisiana, U.S.                                                                

      Motiva Norco               N     Aug 29, 08   220,000  Full shutdown for       
      Saudi Arabian Oil Co,              to                  Hurricane Gustav.       
      Royal Dutch Shell PLC            Sep 08, 08                                    
      Louisiana, U.S.                                                                

      Valero Houston             N     Aug 29, 08    90,000  Runs cut because of     
      Valero Energy Corp                 to                  Hurricane Gustav. Normal
      Texas, U.S.                      Sep 08, 08            operations resumed.     

      Valero Port Arthur         N     Aug 29, 08   325,000  Runs cut for Hurricane  
      Valero Energy Corp                 to                  Gustav. Restart         
      Texas, U.S.                      Sep 08, 08            confirmed.              

      Motiva Convent             N     Aug 29, 08   235,000  Full shutdown in        
      Motiva Enterprises                 to                  preparation for Hurricane
      LLC                              Sep 07, 08            Gustav. Restart         
      Louisiana, U.S.                                        confirmed.              

      Exxon Mobil Baytown        N     Aug 29, 08   563,000  Runs cut for Hurricane  
      Exxon Mobil Corp                   to                  Gustav.                 
      Texas, U.S.                      Sep 05, 08                                    

      Exxon Mobil Beaumont       N     Aug 29, 08   365,000  Runs cut for Hurricane  
      Exxon Mobil Corp                   to                  Gustav.                 
      Texas, U.S.                      Sep 05, 08                                    

      Murphy Meraux              N     Aug 29, 08   125,000  Full shutdown for       
      Murphy Oil Corp                    to                  Hurricane Gustav. Restart
      Louisiana, U.S.                  Sep 05, 08            confirmed.              

      Marathon Garyville         N     Aug 29, 08   275,000  Full shutdown for       
      Marathon Oil Corp,                 to                  hurricane Gustav. Restart
      Ashland Inc                      Sep 03, 08            confirmed.              
      Louisiana, U.S.                                                                

      Motiva Port Arthur         N     Aug 29, 08   285,000  Runs cut to minimum rates
      Motiva Enterprises                 to                  for Hurricane Gustav.   
      LLC                              Sep 03, 08                                    
      Texas, U.S.                                                                    

      Conoco Lake Charles        N     Aug 29, 08   252,000  Full shutdown for       
      ConocoPhillips                     to                  Hurricane Gustav. Restart
      Louisiana, U.S.                  Sep 03, 08            confirmed.              

      Citgo Corpus Christi       N     Aug 22, 08   156,000  FCC shuts due to power  
      Petroleos de                       to                  failure. Restart        
      Venezuela SA                     Aug 25, 08            confirmed.              
      Texas, U.S.                                                                    

      Valero Delaware City       U     Aug 20, 08   190,200  FCC output cut by       
      Valero Energy Corp                 to                  repairs.                
      Delaware, U.S.                   Aug 25, 08                                    

      North Pole                 U     Aug, 08      220,000  Runs cut for unspecified
      Koch Industries Inc                to                  repairs, gasoline       
      Alaska, U.S.                     Aug, 08               production reduced.     

      Frontier El Dorado         P     Aug, 08      112,000  Coker installation      
      Frontier Oil Corp                  to                  begins.                 
      Kansas, U.S.                     Aug, 08                                       

      PEMEX Cardenas             P     Aug 16, 08   190,000  Diesel sulfur recovery  
      Minatitlan                         to                  units shut for          
      Petroleos Mexicanos              Oct 01, 08            maintenance.            
      Mexico                                                                         

      Conoco Bayway Linden       U     Aug 16, 08   238,000  Un-named unit shut,     
      ConocoPhillips                     to                  causing flaring.        
      New Jersey, U.S.                 Aug, 08                                       

      Sunoco Toledo              P     Qtr 3, 08    150,000  CDU, FCC units to shut in
      Sunoco Inc                         to                  third quarter           
      Ohio, U.S.                       Qtr 3, 08             maintenance.            

      Shell Canada Sarnia        U     Aug 15, 08    71,820  Partial shutdown after  
      Royal Dutch Shell PLC              to                  unit fails. Shell wouldn’t identify      
      Ontario, Canada                  Aug, 08             the unit and said customer  
                                                             needs are being met during the outage.      

      Conoco Wood River          U     Aug, 08      306,000  FCC shuts for           
      EnCana Corp,                       to                  maintenance.            
      ConocoPhillips                   Aug, 08                                       
      Illinois, U.S.                                                                 

      Alon Big Spring            P     Aug 13, 08    70,000  Repairs to cat crack will
      Alon Israel Oil Co                 to                  be complete Aug. 13 and 
      Ltd                              Aug 26, 08            oil will be put in Aug. 
      Texas, U.S.                                            26. Repairs to the alky 
                                                             unit will be complete   
                                                             Sept. 3 and oil will be 
                                                             put in Sept. 9.         

      Valero Corpus Christi      U     Aug 13, 08   110,000  CDU shuts for unplanned 
      East                               to                  maintenance. Restart    
      Valero Energy Corp               Aug 21, 08            confirmed.              
      Texas, U.S.                                                                    

      Conoco Borger              P     Aug 12, 08   146,000  Repairs to fccu’s       
      ConocoPhillips,                    to                  electrostatic           
      EnCana Corp                      Aug 21, 08            precipitator.           
      Texas, U.S.                                                                    

      Holly Woods Cross          P     Aug 11, 08    26,000  Turnaround for 26 days  
      Holly Corp                         to                  starts in week of Aug. 11
      Utah, U.S.                       Sep 05, 08            at Woods Cross, Utah    
                                                             refinery.               

      Chevron El Segundo         P     Aug 11, 08   260,000  Turnaround shuts        
      Chevron Corp                       to                  unidentified unit.      
      California, U.S.                 Aug, 08                                       

      Citgo Corpus Christi       U     Aug 11, 08   156,000  CDU, vacuum unit shuts  
      Petroleos de                       to                  for repairs.            
      Venezuela SA                     Aug 16, 08                                    
      Texas, U.S.                                                                    

      Exxon Mobil Baytown        U     Aug 11, 08   563,000  Hydrocracker shuts for  
      Exxon Mobil Corp                   to                  repair. Restart         
      Texas, U.S.                      Aug 12, 08            confirmed.              

      Marathon Catlettsburg      N     Aug 10, 08   239,000  Runs cut after leak shuts
      Marathon Oil Corp,                 to                  crude oil supply        
      Ashland Inc                      Aug 13, 08            pipeline. Restart       
      Kentucky, U.S.                                         confirmed.              

      Total Port Arthur          P     Aug 06, 08   240,000  Two package boilers shut
      Total SA                           to                                          
      Texas, U.S.                      Aug 24, 08                                    

      Tesoro Wilmington          P     Aug 06, 08   100,000  Alkylation unit shuts.  
      Tesoro Corp                        to                  Restart confirmed.      
      California, U.S.                 Aug 08, 08                                    

      Citgo Corpus Christi       U     Aug 06, 08   156,000  Crude vacuum unit       
      Petroleos de                       to                                          
      Venezuela SA                     Aug 07, 08                                    
      Texas, U.S.                                                                    

      Petro-Canada Edmonton      P     Aug 05, 08   135,000  Turnaround for 60 days  
      Petro-Canada                       to                  began Aug. 3. Restart   
      Alberta, Canada                  Nov 03, 08            confirmed Nov. 3. Full  
                                                             rates planned for end November. 

      Petro-Canada Edmonton      P     Qtr 3, 08    135,000  Full shutdown of 135,000
      Petro-Canada                       to                  bbl/day refinery during 
      Alberta, Canada                  Oct, 08               the second half 2008 to 
                                                             allow new units to be added to the   
                                                             plant as part of an upgrade.  
       

      Marathon Texas City        N     Aug 04, 08    72,000  Full shutdown because of
      Marathon Oil Corp,                 to                  storm. Restart confirmed.
      Ashland Inc                      Aug 06, 08                                    
      Texas, U.S.                                                                    

      Valero Port Arthur         N     Aug 04, 08   325,000  Rates reduced because of
      Valero Energy Corp                 to                  storm                   
      Texas, U.S.                      Aug 05, 08                                    

      Valero Texas City          P     Aug 04, 08   230,000  Rates reduced because of
      Valero Energy Corp                 to                  storm                   
      Texas, U.S.                      Aug 05, 08                                    

      Valero Houston             N     Aug 04, 08    90,000  Rates reduced because of
      Valero Energy Corp                 to                  storm.                  
      Texas, U.S.                      Aug 05, 08                                    

      Exxon Mobil Torrance       P     Aug, 08      155,000  Hydrodesulfurization unit
      Exxon Mobil Corp                   to                  shuts for repairs.      
      California, U.S.                 Aug 31, 08                                    

      Petro-Canada Edmonton      U     Aug 03, 08   135,000  FCC shuts because of    
      Petro-Canada                       to                  fault, leading to regional gasoline      
      Alberta, Canada                  Aug 27, 08         shortages. Restart confirmed.             

      Holly Woods Cross          P     Aug, 08       26,000  Turnaround planned.     
      Holly Corp                         to                                          
      Utah, U.S.                       Sep, 08                                       

      Placid Port Allen          P     Aug, 08       57,000  Turnaround scheduled for
      Placid Refining Co                 to                  30 days during          
      LLC                              Sep, 08               August-September.       
      Louisiana, U.S.                                                                

      Tesoro Wilmington          N     Jul 30, 08   100,000  Two process units shut  
      Tesoro Corp                        to                  after power failure.    
      California, U.S.                 Aug, 08                                       

      BP Texas City              P     Jul 29, 08   470,000  FCC Electrostatic       
      BP PLC                             to                  Precipitator Stack trips
      Texas, U.S.                      Aug, 08               and rates reduced.      

      Irving Saint John          N     Jul 29, 08   300,000  Runs cut after power    
      Irving Oil Corp                    to                  loss.                   
      Newfoundland and                 Aug, 08                                       
      Labrador, Canada                                                               

      ConocoPhillips             U     Jul 28, 08   247,000  FCC shut because of leak
      Alliance                           to                                          
      ConocoPhillips                   Aug, 08                                       
      Louisiana, U.S.                                                                

      Valero Port Arthur         P     Jul 23, 08   325,000  Runs cut 10%-20% by     
      Valero Energy Corp                 to                  Hurricane Dolly.        
      Texas, U.S.                      Jul, 08                                       

      Valero Houston             N     Jul 23, 08    90,000  Runs cut 10%-20% by     
      Valero Energy Corp                 to                  Hurricane Dolly.        
      Texas, U.S.                      Jul, 08                                       

      BP Texas City              U     Jul 22, 08   470,000  FCC No. 1 runs cut      
      BP PLC                             to                  because of fault.       
      Texas, U.S.                      Jul, 08                                       

      Valero Aruba               U     Jul 19, 08   275,000  Runs cut by 5,000 barrels
      Valero Energy Corp                 to                  a day for minor         
      Aruba                            Jul, 08               maintenance. Operations 
                                                             return to normal.       

      Shell Deer Park            N     Jul 17, 08   340,000  FCC rates reduced after 
      Royal Dutch Shell                  to                  power disruption. Restart
      PLC, Petroleos                   Jul 19, 08            confirmed.              
      Mexicanos                                                                      
      Texas, U.S.                                                                    

      LyondellBasell             P     Jul, 08      287,000  CDU, coker shut for      Houston                            to                  maintenance. Crane      
      Access Industries                Sep, 08               collapse during repairs 
      Holdings LLC                                           kills 4 and delays work.
      Texas, U.S.                                            Rest of refinery operated
                                                             normally during the     
                                                             event.                  

      BP Toledo                  P     Jul 15, 08   155,000  Hydrocracker, reformer  
      BP PLC                             to                  shut for maintenance.   
      Ohio, U.S.                       Sep 04, 08                                    

      Murphy Meraux              P     Jul, 08      125,000  Runs cut 10% on weak    
      Murphy Oil Corp                    to                  margins.                
      Louisiana, U.S.                  Aug, 08                                       

      Murphy Superior            P     Jul, 08       35,000  Runs cut 25% on weak    
      Murphy Oil Corp                    to                  margins.                
      Wisconsin, U.S.                  Aug, 08                                       

      PEMEX Hidalgo Tula         N     Jul 15, 08   273,000  Power cut shuts several 
      Petroleos Mexicanos                to                  units. Restart confirmed.
      Mexico                           Jul 17, 08                                    

      Citgo Corpus Christi       P     Jul 15, 08   156,000  FCC shuts for           
      Petroleos de                       to                  maintenance. Unit       
      Venezuela SA                     Jul 17, 08            restarts July 16.       
      Texas, U.S.                                                                    

      Conoco Borger              P     Jul 13, 08   146,000  Repairs scheduled on the
      ConocoPhillips,                    to                  electrostatic           
      EnCana Corp                      Jul 22, 08            precipitators of unit 29,
      Texas, U.S.                                            a fluid catalytic  cracker.      

      LyondellBasell             P     Jul 10, 08   287,000  Coker shutdown extended 
      Houston                            to                  through November. Restart
      Access Industries                Nov 26, 08            confirmed.              
      Holdings LLC                                                                   
      Texas, U.S.                                                                    

      Total Port Arthur          P     Jul 09, 08   240,000  Hydrotreater and eight  
      Total SA                           to                  other units shut. Units 
      Texas, U.S.                      Jul 27, 08            restarting July 27 to   
                                                             July 31.                

      Petro-Canada Edmonton      U     Jul 09, 08   135,000  Full shutdown after     
      Petro-Canada                       to                  boiler failure. Restart 
      Alberta, Canada                  Jul 16, 08            confirmed.              

      Valero Ardmore             U     Jul 08, 08    85,000  FCCU shut after power   
      Valero Energy Corp                 to                  disruption, restart     
      Oklahoma, U.S.                   Jul 11, 08            confirmed.              

      Tesoro Martinez            U     Jul 08, 08   166,000  Gasoil hydrotreater shuts
      Tesoro Corp                        to                  because of leaking valve.
      California, U.S.                 Jul 09, 08            Restart confirmed.      

      US Oil Tacoma              N     Jul 07, 08    35,000  Runs cut 50% after power
      Nationale A                        to                  failure.                
      Portefeuille                     Jul, 08                                       
      Washington, U.S.                                                               

      Lion Oil El Dorado         N     Jul, 08       58,000  Asphalt production cut by
      Ergon Inc                          to                  50 percent after unit 9 
      Arkansas, U.S.                   Sep, 08               shut.                   

      BP Texas City              U     Jul 01, 08   470,000  Residual hydrotreater   
      BP PLC                             to                  restarts.               
      Texas, U.S.                      Jul 01, 08                                    

    • #6255
      Charles Randall
      Participant

      Here is the Feb 2009 Update to the NA Refinery Shutdown Planned & Forecast Table from Bloomberg.
       
       Looks like they caught (most anyway)  lot of the changes to project status.
       
      Looking back it is amazing the amount of downtime due storms, economic S/D, accidents & Maintenance T/A for 2008. The 2008 utilization rates will be lucky to make last years 85% level and 2009 is off to lower level of 75-80% due demand & economics!
       
      Given the low traffic to this site for this type information – this will probably be my last post for these schedule updates.
        
      Regards

    • #6251
      Lucibar Davalillo
      Participant

      Mr. Randal,
      I found this report very helpful and your comments very valuable; there may be too many others issues going on that we coking people have not dedicated enough time to comment, but no doubt you’re doing a great job keeping us inform.
       
      Will try harder keeping up with this report if you decide continue issuing it,
      thanks,
      Lucky

Viewing 2 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum