      US Refinery Status: Conoco Bayway Undergoing Planned Work
      DOW JONES NEWSWIRES  Jan. 08, 2010 
      The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn’t purport to be a comprehensive list.
      ConocoPhillips (COP) is performing planned maintenance at its Bayway refinery in Linden, NJ, according to a company spokesperson who declined to provide further details. The Borger, Texas, plant is scheduled to restart the FCCU, unit 40, Thursday.
      Royal Dutch Shell PLC (RDSA) said Thursday it plans to close its 130,000- barrel-per-day refinery in the city of Montreal East, Quebec, and convert it into a fuel terminal.
      Husky Energy Inc.’s (HUSKF, HSE.T) refinery in Lima, Ohio, is returning to normal operations after the restart following a plant-wide turnaround in October was delayed by operations snags, a company spokesman said Thursday.
      BP PLC (BP) reported Thursday unplanned flaring at its Carson, Calif., refinery. It is unclear whether this is related to the shutdown of a crude unit and a coker for planned seasonal work. Operator Refinery Capacity Description Restart
      (in 000s
      bbl/day)
      UNPLANNED
      CANADA

      EAST COAST

      Sunoco Marcus Hook, 178.0 Pump failure caused FCCU to shut
      PA Dec. 21, and restart process caused
      flaring, a Pennsylvania officials said.
      A flaring event was reported on the
      Delaware side of the refinery, an
      official said Dec. 23.

      CARIBBEAN

      GULF COAST

      Exxon Baytown, TX 572.5 Booster Station 4 experienced
      a line snag
      , which had a “minimal
      impact on supplies,” co. said in
      a Dec. 30 filing.

      Plant girbotol, used to strip acid
      gases from refinery gases, caused
      flaring due to line restriction
      Jan. 5.

      Alon Big Spring 70.0 Mechanical snag at sulfur re- n/a
      TX covery unit
      No. 2 causes brief
      flaring event; impact on pro-
      duction unclear.

      BP Texas City 455.8 Vapor recovery section at Dec 21
      resid hydrotreating unit shut
      Dec. 11 for 10 days of mainte-
      nance.

      FCCU #3 restarted after snag Dec. 14
      Dec. 12

      Conoco Borger 146.0 Returned to normal operations
      Tx after partial power failure Sat.,
      Co. said Dec. 18.

      Unidentified process upset Dec. 24
      led to flaring.

      Flint Corpus 300.0 Gasoil unit will be re- Dec 10
      Hills Christi, TX started Dec. 10 after shutting
      unplanned on Dec. 9.

      Leaky component in hydrobon unit
      was isolated at the East Refinery
      on Dec. 28.

      Lyondell Houston Crude Unit, 130 b/d, restarted
      over the weekend after completing
      mechanical repairs, Co. said Dec. 28.
      It was at 50% after a leak was
      discovered in an overhead line
      Dec. 16, but was shut completely last
      week to replace pipe.

      Valero Corpus 315.0 Hydrodesulfurization unit in Dec 10
      Christi, TX Complex 1 returned to service
      Dec 10; shut Dec 8.
      Work started at SRU starts
      Dec. 17.

      Leak found in sour water line
      from the ULSD/SMR units at the
      East Plant, filing said Jan. 2.

      Valero Texas City 245.0 A small fire errupted Dec. 24
      TX at the crude unit/overhead
      fuel line at 5:30 a.m. No
      reported injuries. Co. said
      Dec. 28 that production of
      gasoline and distillates
      would be impacted during repairs;
      no estimates given. Coker unit
      that was shut
      because of this
      restarted Dec. 30.

      Explosion at boiler on Dec 4
      resulted in one fatality and
      injures two workers. Refinery
      operations not affected.

      Citgo Corpus Christi 163.0 Platformer reactor was shut after
      TX a brief fire Dec. 30. No injuries.
      Co. still assessing damages.

      MIDWEST

      Husky Lima, OH 160.0 Refinery was being returned to
      normal operations after a minor
      fire damaged isocracker Nov. 21
      ,
      Co. said Jan. 7. Plant was running
      at a reduced rate of 120,000 b/d.

      ROCKY MOUNTAINS

      Conoco Billings, MO 58.0 A fire erupted at a heavy oil tank
      Dec. 24
      and was contained with no
      injuries. Plant operated normally
      throughout, and the cause is being
      investigated, Co. said Dec. 29.

      Tesoro Salt Lake City 58.0 A small, brief fire erupted at a
      UT low-sulfur pump Jan. 4 due to a
      minor seal leak; no damages.

      WEST COAST

      BP Ferndale 225.0 Refinery operations nearing Dec 10
      WA normal rates Dec 10 after
      steam/boiler snag on Dec 11.

      BP Carson, CA 265.0 Unplanned flaring
      event Dec. 28 was caused by
      shutdown of fluid feed hydrogen
      desulfurizer, which had no impact
      on production, company said Dec. 29.

      Reported unplanned flaring on Jan. 7.

      Tesoro Wilmington 96.8 A crack in a storage tank caused
      CA 4,600 barrels of naphtha to leak
      Jan. 4. Co. said it had no impact
      on operations.

      PLANNED
      CANADA

      Shell Montreal 130.0 The refinery will be converted
      Quebec into a fuel terminal, Co. said
      Jan. 7. No timeline provided.

      CARIBBEAN
      Valero Aruba 235.0 The refinery that was shut
      in June for 2-3 months for
      economic reasons is being
      closed indefinitely.

      EAST COAST
      Sunoco Westville, NJ 145.0 Idling all refining Mid-Nov
      operations indefinitely due
      to poor economics, Co. said
      Oct. 6.

      Reformer unit shut in Girard n/a
      Point section in early Oct
      for economic reasons. Shutdown
      to last 1-6 months.

      Valero Delaware City 210.0 Plant to be permanently shut due
      DE to poor economics, announced
      Nov. 20. Delaware Official said
      it would be shut on Nov. 22.

      The plant’s production units will
      be dismantled and disposed of in
      coming months, Co. said Dec. 23.

      Valero Paulsboro 185.0 Refinery will operate during Dec. 14-21
      NJ FCCU work that began on Nov.
      Nov. 28-29. The entire refinery
      was scheduled to shut during the
      work; the Co. also shortened the
      duration of the FCCU work to 2-3
      weeks from 6 on Dec. 3.

      Conoco Linden, NJ 238.0 The Bayway refinery is undergoing
      planned maintenance, Co. said Jan.7.
      No details regarding unit(s) or
      duration provided.

      Western Yorktown 64.5 Planned work scheduled 3Q 2010.
      Va.

      MIDWEST

      ROCKY MOUNTAIN

      Western Bloomfield, 16.8 Co. announced plans Nov. 9
      NM to idle plant
      and shift
      production to Gallup plant.

      Tesoro Salt Lake City, 58.0 Planned turnaround in 2010;
      Utah no timetable disclosed.

      Tesoro Mandan, N.D. 58.0 Planned turnaround in 2010;
      no timetable disclosed.

      GULF COAST

      Alon Krotz Springs 80.0 Plantwide turnaround starts Nov. Dec.
      LA. in Nov.

      Chevron Pascagoula, 330.0 Pre-commercial heavy oil 2010
      Miss. conversion project delayed

      from 2008 to 2010 due to
      economic factors.

      Conoco Sweeny, TX 247.0 FCCU No. 3 shut 12/7 to con- Dec 17
      nect wet gas scrubber.

      Unit 3 shut to connect an Jan. 18
      emission control device (wet
      gas scrubber), which will not
      affect refining operations,
      a Jan. 4 filing stated.

      Conoco Borger 146.0 FCCU, Unit 40, scheduled for
      TX restart Jan. 7; flaring to last
      10 days.

      Flint Corpus 288.1 $250 mln project for new Spr
      Hills Christi, TX diesel desulfurization, 2010
      sulfur recovery unit to begin
      in Fall 2008. Construction
      to last 18 months.

      Marathon Garyville 245.0 Project to increase crude oil 4Q
      LA refining capacity by 180,000- 2009
      b/d 85% complete, as of end
      April. New units expected
      start up in 4Q 2009. Entire
      refinery reaches full capacity 2Q’10

      Motiva Port Arthur 285.0 Expansion project to increase 1Q
      TX throughput capacity by 325,000 2012
      b/d, to 610,000-b/d, slowed.
      Completion now seen 1Q
      2012, from 2010.
      Valero Corpus 340.0 Coker unit shutdown for econo– n/a
      Christi, TX mic reasons and planned work;
      delayed to June 19 from June
      12. The 20,000-b/d unit will
      remain off line through July
      but could restart at any time
      if margins improve.

      20,000-b/d FCCU in East n/a
      Plant shut; West Plant

      50,000-b/d FCCU at reduced
      rates since mid-Dec for
      economic reasons.

      15,000-b/d HCU in East Plant
      set for 18 days of work in Jan.

      36,000-b/d HCU in West Plant
      sent for 18 days of work in Feb.

      Valero Norco, LA 250.0 Upgrade project to build 2012
      a new diesel hydrotreater
      unit moved from 2010 to
      4Q 2012.

      Turnaround at crude/ coker unit 1Q
      set for 36 days in Jan.
      Entire Plant
      to be shut for work.
      The coker will operate at
      50% of capacity when
      restarted due to poor
      economics.

      Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a
      TX rates since mid-Dec for
      economic reasons.

      45,000 b/d HCU to undergo Spring
      38 days of work in March.

      Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a
      rates since mid-Dec for
      economic reasons.

      Marathon Texas City 76.0 Shutting entire plant for
      TX 14-day turnaround
      starting
      Jan. 4; emissions expected
      from FCC, SRU, platformer,
      alkylation units.

      Western El Paso, TX 29.5 Planned work at south side of
      plant, including crude unit
      and FCCU in Jan for 20 days.

      WEST COAST

      BP Carson, CA 265.0 Refinery operations will n/a
      not be impacted by a
      planned flaring event
      Dec 13-16.

      A crude and a coker unit shut
      for planned seasonal work
      , source
      said Jan. 6. No details re duration
      but supporting units may be shut
      as well. Co. reported planned flaring
      for Jan. 6-15.

      Tesoro Golden Eagle 166.0 40 days of work, including FCCU, Feb.
      alky starting Jan. 8

      Tesoro Oahu, HI 94.0 Planned turnaround in 2010;
      no timetable disclosed.

      Valero Wilmington, 135.0 FCCU unit operating at normal rates,
      CA Co. said Dec. 28, after turnaround
      started in November was completed.
      The crude and coker units shut for
      part of this work were restarted
      Dec. 9 and are operating normally.

      Some units restarted, in- Dec 9
      CA cluding crude and coker
      units, while turnaround work
      continues since Nov. 11 at
      the FCCU. The FCCU is seen Dec 20
      restarting around Dec 20.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum