      Refinery Status: Conoco Begins Maintenance At Borger, TX, Plant
       

      DOW JONES NEWSWIRES  June 7, 2010The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn’t purport to be a comprehensive list.
      Several units at ConocoPhillips’s (COP) refinery in Borger, Texas, will undergo maintenance June 5 through July 22, including the fluid catalytic cracker, a key gasoline-making unit, a regulatory filing said. The plant reported flaring related to
      Exxon Mobil Corp.’s (XOM) refinery in Baytown, Texas, experienced a compressor snag at a deasphalting unit Saturday, but the incident did not impact supplies, according to a filing with state environmental regulators.
      Flint Hills Resources LP’s refinery in Corpus Christi, Texas, reported a leaking cooling tower at its West Plant over the weekend, a regulatory filing said.
      Valero Energy Corp. (VLO) said maintenance would soon begin at its Aruba refinery, which the company has been trying to sell and shuttered last year for economic reasons. The company added it aims to restart the refinery later this year, unless economic conditions deteriorate. The refinerywide maintenance, called a “turnaround,” will commence in the next few weeks. That effort is expected to last 90 days.
      Tesoro Corp. (TSO) completed a plant-wide turnaround at its Mandan, North Dakota, refinery early last week and returned production to normal levels, a company spokesman said Thursday.
      A key-gasoline making unit at Citgo’s Corpus Christi, Texas, refinery tripped Wednesday night after a heavy rain storm, the company reported in a filing to environmental regulators. The company reduced the rates at a fluid catalytic cracker at the East plant of the 163,000 barrel-a-day refinery, according to the report. For more detailed information, search Dow Jones Newswires using the code N/REF.

      Operator Refinery Capacity Description Restart
      (in 000s
      bbl/day)
      UNPLANNEDGULF COAST

      BP Texas City 455.8 Brief power outaged May 25
      TX

      Lyondell Houston 268.0 CDU hit by fire on May 17 is Jun 20
      TX expected to restart in four
      weeks. 2nd crude unit re-
      started from unplanned mainte-
      nance on May 19. All other pro-
      cess units have been operating
      with feedstocks on hand.

      Exxon Chalmette 192.0 Minor upset June 1. June 2
      La.

      Exxon Baytown, TX 572.0 Deasphalting unit was shut
      after J1 compressor went
      offline
      June 5; no impact
      to supplies.

      Shell Deer Park 310.0 Early day fire on May 17 May 21
      results in feed rate cut to
      FCCU; unit is expected to
      resume normal rates by May
      21, a person familiar with
      operations at the plant said
      on May 18.

      Flint Corpus Chrsti 288.5 Reported leaking cooling tower
      Hills TX at West Plant June 5.

      Conoco Borger, TX 146.0 Unit 40 FCCU electrostatic
      precipitator equipment
      malfunctioned
      June 4; an
      alternate was restarted.

      MIDWESTRockies
      Sinclair Casper, 20.0 Refinery running at reduced rates
      Wyo. after explosion, co said. May 27
      WEST COAST

      Chevron El Segundo 279.0 Isomax plant shut March 19 n/a
      CA due to “small” fire. No
      estimate on restart.

      Chevron Richmond 289.0 FCCU restarted May 31.

      BP Carson, CA 265.0 FCCU unit shut down for unplanned n/a early June
      work, source said May 26. Unit could
      be down for 10 days, traders said.

      Unspecified unit shutdown on
      May 18.

      Conoco Carson, CA 139.0 Company reports flaring due to
      an exceedance in sulfur dioxide
      emission. Event noted as “non-
      emergency; cause unclear.

      Tesoro Wilmington 100.0 Hydrocracker Unit Shut April 11 n/a
      CA due to a mechanical issue. No
      estimate on restart.

      Tesoro Anacortes 120.0 Fire at naphtha unit April 2 end Q2
      WA killed seven.

      All production operations to
      temporarily shut down later this
      month until repairs are done and
      investigations progress, company said
      April 12. Supply will be met from
      other companies’ refineries or from
      spot market. Plant was processing
      70,000 b/d if crude after blast.

      Plant will be shut through 2Q,
      Co. said April 30.

      Exxon Torrance, CA 150.0 Hydrocracker – 20,500 b/d – was
      getting ready to be restarted,
      flaring to take place on May 6-10,
      Co. said May 5. Unit was shut
      April 28 after a compressor
      went offline.
      Impact unclear.

      Exxon puts out fire at remote
      part of plant
      on May 31.
      PLANNEDCANADA

      Shell Montreal 130.0 The refinery could be convertedQuebec into a fuel terminal but Co. said its in
      talks with 2 potential buyers.
      CARIBBEAN

      Valero Aruba 235.0 Valero says buyers still interested in
      plant. Tax dispute resolved. Work to begin
      soon on plant for possible restart.
      EAST COAST

      Sunoco Westville 145.0 Idling all Eagle Point refin- n/a
      NJ ing operations indefinitely due
      to poor economics, Co. said
      Oct. 6.

      Sunoco Marcus Hook 178.0 Key Gasoline Unit Restarted May 22

      Valero Delaware 210.0 PBF Investments has closed April 2012
      deal to buy plant.
      Petroplus
      said May 5 the plant would be
      restarted in 2Q of 2011.

      Western Yorktown 64.5 Planned work scheduled 3Q 2010. Q3 2010
      VA

      GULF COAST

      Conoco Borger, TX 146.0 Maintenance activity to take
      place at several units June 5-
      July 22, with emissions from
      units including FCC, GOHDS,
      SCOT unit incinerator, SRU
      incinerator and units 41, 42,
      45 and 98.

      Alon Krotz 100.0 Refinery will be back in “full
      Springs, La. operation” in the second half of
      May, Co. said May 6. Plant has
      been shut since Nov. 2009 for
      a turnaround.

      BP Texas City 455.8 Planned work began at an FCC
      vessel April 23.

      An unidentified unit was being
      restarted May 5-6, a filing said.

      Chevron Pascagoula 330.0 Pre-commercial heavy oil 2010
      Miss. conversion project delayed
      from 2008 to 2010 due to
      economic factors.

      Work is progressing on the
      continuous catalytic reformer,
      expected to be completed by
      mid-2010, Co. said Feb. 25.
      Co. is planning to put a premium
      base-oil facility at plant.

      Flint Corpus $250 mln project for new Spring 2010
      Hills Christi, TX diesel desulfurization,
      sulfur recovery unit to begin
      in Fall 2008. Construction
      to last 18 months.

      Motiva Port Arthur 285.0 Delayed Coking Unit to restart May 12
      TX Wed., May 12, following two
      weeks of maintenance.

      Expansion project to increase 1Q
      throughput capacity by 325,000 2012
      b/d, to 610,000-b/d, slowed.
      Completion now seen 1Q
      2012, from 2010.

      Valero Corpus 340.0 Plant shut; West Plant n/a
      Christi, TX 50,000-b/d FCCU at reduced
      rates since mid-Dec for
      economic reasons.

      Valero Norco, LA 250.0 Upgrade project to build 2012
      a new diesel hydrotreater
      unit moved from 2010 to 4Q 2012.

      Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a
      TX rates since mid-Dec for
      economic reasons
      .

      Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a
      rates since mid-Dec for
      economic reasons.
      MIDWEST

      BP Toledo, OH 155.0 $400 million upgrade 2012
      to start 2010.

      Valero Memphis, TN 195.0 Fire erupted at a selective
      hydrogenation unit April 29;
      it was quickly extinguished.
      One worker in serious condi-
      tion due to burns. Fire damage
      was relatively minor and any
      delay to related FCCU would be
      minimal, Co. said April 30.
      Entire plant is in turnaround.
      Work began early March.

      CVR Coffeyville 115.0 New ultra low sulfur gasoline
      unit
      will be brought online
      in 2Q, Co. said May 3.
      Previous target was to have
      unit up by end of 2010.

      ROCKY MOUNTAIN

      Suncor Commerce 93.0 Planned work at reformer unit Fall
      City, CO deferred to Fall 2010 from Feb 2010
      28 start date.

      Tesoro Mandan, N.D. 60.0 Refinery will return to ser- May
      vice early in May 23 week 21-22
      from turnaround maitenance
      that began on April 19.

      WEST COAST

      Exxon Torrance, CA 150.0 Maintenance at hydrotreater and
      sulfur recovery units restarted, co
      said May 26.

      BP Carson, CA 265.0 Planned flaring activity on
      March 29-April 20 and, Co. reported
      in filings.

      Planned flaring activity reported
      for April 23-May 7, an April 22
      filing said.

      Six days of flaring to begin on
      May 4, a filing stated.

      Conoco Wilmington 139.0 Scheduled maintenance activity
      CA has begun, Co. said April 23. Co.
      declined to provide details about
      the units involved or the schedule.
      Traders familiar with operations
      said work includes a
      hydrotreater.

      Tesoro Golden Eagle 166.0 Turnaround work began in early n/a
      Martinez, Dec at FCCU and alkylation
      CA unit, the Co. said on Feb 3.
      Restart timing unclear.
      Other major turnaround mainte- 2011
      nance deferred to 2011 from
      late 2009, the Co. said Feb 3.

      Tesoro Oahu, HI 94.0 Planned turnaround work will
      Kapolei begin 3Q, 2010, the Co. said
      on Feb 3.

      Planned work deferred to 2011 from
      late 2009, the Co. said Feb 3.

      Chevron El Segundo 279 Flaring took place on May 4, a May 5
      filing said. Traders said it was
      related to a 75k b/d FCCU that went
      down May 4 and was restarted; it is
      operating at 50% of capacity.

      Frontier Cheyenne 47.0 Fall 2010 FCCU, hydrotreater
      WY turnarounds delayed by a year, Co.
      said May 6. FCC delay will limit
      heavy crude processing ability to
      2/3 of capacity.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum