Update Nov 2009 – US Refinery Plan/Unplan T/A

Home Forums Coking Maintenance Shutdown/Turnaround Update Nov 2009 – US Refinery Plan/Unplan T/A

Viewing 0 reply threads
  • Author
    Posts
    • #2901
      basil parmesan
      Participant

      US Refinery Status: Suncor’s Upgraded Returned To Normal

      DOW JONES NEWSWIRES Nov. 4, 2009
      The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn’t purport to be a comprehensive lists.
      Suncor Energy Inc. (SU, SU.T) said Monday that an upgrader damaged in an October fire has been is back to normal rates.
      BP PLC (BP) reported that ultraformer #4 resumed production Sunday after a planned turnaround, according to an environmental filing.
      Motiva Enterprises LLC’s Port Arthur, Texas refinery reported a snag at its fluid catayltic cracking unit over the weekend, according to an environmental filing.
      Valero Energy Corp. (VLO) reported late Friday that operations of a catalytic reformer at its Port Arthur, Texas, refinery were “upset,” according to an environmental filing.
      Citgo Corp. restarted an alkylation unit Thursday at its Corpus Christi, Texas, oil refinery that had been shut July 19 by a near-fatal explosion.
      For more detailed information, search Dow Jones Newswires using the code N/ REF. Operator Refinery Capacity Description Restart
      (in 000s
      bbl/day)
      UNPLANNED
      CANADA

      Suncor Alberta One of two oil sands up- n/a
      graders is back to normal
      rates, co said Nov. 2
      following a minor fire on Oct 12.

      Suncor Sarnia 85.0 Hydrocracker unit shut Oct n/a
      Ontario 11 due to fire at associated
      compressor; no restart esti-
      mate available.

      EAST COAST

      Conoco Linden 238.0 Officials consider run cuts n/a
      N.J. due to slack demand, a per-
      son familiar with operations
      said on July 17.

      CARIBBEAN

      CPC Bayamon 48.0 Explosion, fire at facility n/a
      Puerto Rico early on Oct. 23. 11 out of
      30 storage tanks exploded.

      Hovensa St. Croix 500.00 Shuts FCCU unit for repairs. Nov. 6

      GULF COAST

      BP Texas City 455.8 SRU hit snag Oct. 26, back to normal Oct. 27
      Co. restarts Ultraformer #4 Nov. 1

      Citgo Corpus 163.0 Alkylation unit shut July 19 end-Oct
      Christi, TX by near-fatal explosion to
      return to service by end-Oct.
      The restart was delayed from
      early-Oct due to safety issues.
      FCCU, restarted Oct. 29

      Motiva Port Arthur 285.0 FCCU hits snag on Oct. 31.
      TX

      Valero Corpus 142.0 Restarting West Plant Hydrocracker
      unit Oct. 25 that was shut Oct. 7
      due to small fire. An SMR unit was shut
      for maintenance after the
      fire; restart Oct. 10.
      West Plant stabilizer tower shut
      for maintenance Oct. 26-27.
      Restarting East Plant’s Tank 79
      on Oct. 9.

      Valero Texas City 199.5 Experienced flaring at Complex 1
      tower on Oct. 23.
      Shut the FCCU Oct. 25 to repair
      a slide valve; no restart estimate

      Total Port Arthur 232.0 Operations being restored
      TX on Oct. 22 following plant
      wide power failure earlier
      in the day.
      A fire occurred in a heavy oil n/a
      line between the crude unit and
      the tank farm on Oct 13 during
      the restart of several process
      units that were knocked off-line
      earlier that day by a power snag.
      Identifying a leaky exchanger that
      is causing a cooling tower Oct. 26.

      Co. restarts 3 units Oct. 29, after
      brief shutodwn.

      Chevron Pascagoula, 330.0 A blown cap as plant prepared to
      MS to transfer molten sulfur to a
      barge released the compound into
      the water Oct. 25.

      MIDWEST

      ROCKY MOUNTAINS
      Exxon Billings, MT 60.0 Operations returned to normal
      after a brief power outage hit
      the area Oct. 23.

      Conoco Billings, MT 58.0 A brief area power outage Oct. 23
      impacted operations, local reports.

      CHS Laurel, MT 55.0 Operations returned to normal
      after a brief power outage Oct. 23.

      WEST COAST

      Chevron El Segundo 274.0 Reported flaring at hydrocracker
      CA site on Oct. 24.
      A brief period of flaring n/a
      on Oct 14 is reported to
      state regulators. Filing
      lists cause as “breakdown.”

      PLANNED
      CANADA

      CARIBBEAN

      Valero Aruba 235.0 The refinery that was shut
      in June for 2-3 months for
      economic reasons is being
      closed indefinitely.

      EAST COAST

      Sunoco Westville, NJ 145.0 Idling all refining Mid-Nov
      operations indefinitely due
      to poor economics, Co. said
      Oct. 6. It will take 4-6
      weeks to work through crude
      stocks to shut down.

      Reformer unit shut in Girard n/a
      Point section in early Oct
      for economic reasons. Shutdown
      to last 1-6 months.

      Valero Delaware City 210.0 Coker Unit shut Oct 3-4 and n/a
      DE related gasifier unit to shut
      within a few days for economic
      reasons.
      Maintenance at 80,000-b/d
      FCCU/akly delayed to Nov./Dec.
      Entire plant to be shut down.

      Western Yorktown 64.5 Planned work scheduled 1Q 2010.
      Va.

      GULF COAST

      Alon Krotz Springs 80.0 Plantwide turnaround starts Jan.
      LA. Jan. 1 to last 21 days. 21/22

      Chevron Pascagoula, 330.0 Pre-commercial heavy oil 2010
      Miss. conversion project delayed
      from 2008 to 2010 due to
      economic factors.

      Conoco Borger, TX 146.0 Unidentified units shut for
      planned turnaround, Co. said
      Oct. 9. No further details.
      Shut amine unit for planned Oct. 24
      maintenance Oct. 9-24.

      Conoco Sweeny, TX 247.0 Six weeks of turnaround work Oct 30
      starts Sept. 14 at Units 14,
      9, 38 and 27, which is an
      FCCU.

      Tail gas incinerator shut during Nov. 1
      fall turnaround Sept. 30

      Exxon Baytown 572.5 FCCU No. 3 shut Sep 15. for
      TX planned maintenance.

      Flint Corpus 288.1 $250 mln project for new Spr
      Hills Christi, TX diesel desulfurization, 2010
      sulfur recovery unit to begin
      in Fall 2008. Construction
      to last 18 months.

      Marathon Garyville 245.0 Project to increase crude oil 4Q
      LA refining capacity by 180,000- 2009
      b/d 85% complete, as of end
      April. New units expected
      start up in 4Q 2009.

      Motiva Port Arthur 285.0 Expansion project to increase 1Q
      TX throughput capacity by 325,000 2012
      b/d, to 610,000-b/d, slowed.
      Completion now seen 1Q
      2012, from 2010.

      Shell Deer Park, 340.0 Hydroprocessing unit, cata- Oct 24
      lytic cracker unit and alky-
      lation shut between Oct 1 and
      Oct 24 for fall turnaround
      maintenance.
      Valero Corpus 340.0 Coker unit shutdown for econo- n/a
      Christi, TX mic reasons and planned work;
      delayed to June 19 from June
      12. The 20,000-b/d unit will
      remain off line through July
      but could restart at any time
      if margins improve.

      20,000-b/d FCCU in East n/a
      Plant shut; West Plant
      50,000-b/d FCCU at reduced
      rates since mid-Dec for
      economic reasons. 15,000-b/d HCU in East Plant
      set for 18 days of work in Jan.

      36,000-b/d HCU in West Plant
      sent for 18 days of work in Feb.

      Valero Norco, LA 250.0 Upgrade project to build 2012
      a new diesel hydrotreater
      unit moved from 2010 to
      4Q 2012.

      Turnaround at crude/ coker unit 1Q
      set for 36 days in Jan.
      Entire Plant
      to be shut for work.

      The coker will operate at
      50% of capacity when
      restarted due to poor
      economics.

      Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a
      TX rates since mid-Dec for
      economic reasons.

      45,000 b/d HCU to undergo Spring
      38 days of work in March.

      Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a
      rates since mid-Dec for
      economic reasons.

      Valero Three Rivers 95.0 Plant-wide 24-day turnaround Oct. 2

      WEST COAST

      BP Carson, CA 265.0 Flaring on Oct. 26-Nov.1 is
      related to planned maintenance
      of its hydrotreater.

      Valero Wilmington, Ca 96.86 56,000 b/d FCC/alky to be shut Dec.
      in Nov. for 39 days of work.
      The entire plant will be shut down during
      the turnaround.

      Dow Jones Newswires
      11-03-090845ET

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum