What is the best way to preserve a SRU while I wait for new equipment to arrive at the plant after an unplanned shutdown?
There is a shutdown scheduled to the beginning of 2018, but we lost the tube sheet of the wasteheat boiler.
The equipment supply time is long. In this case, what can I do to reduce the corrosion rate of the equipments and lines?