hi,
our coker is installing deltavalve in coming months. The control panel will be located away from the structure. The operators however would be able to see the drum during the operation.
hi there,
our coker is installing a naphtha wash injection facility to the second stage of the wet gas compressor. We are using centrifugal compressor from MHI. MHI has advised the liquid rate to be at 1wt % of the gas rate.