Closed Coke Slurry System Enhances Coking Operation

with Bernd Lankers & Josef Wadle,  Triplan AG

Download Presentation PDF

Joint-presentation by Owner/Operator and Licensor on the design and operational considerations that are essential to meeting the given DCU revamp objectives. Will address different types of revamps (capacity, reliability, feed-change, product yield enhancements) and primary facilities revisions (preheat circuit, heaters, safeguarding/interlocks systems, etc.) that are commonly modified.

Licensor to overview key project considerations (design, environmental, planning, constructability) as well as essential interactions and information (demonstrated capacity and limitations of existing unit) needed from the owner/operator. Owner/operator to share project development/execution challenges and post revamp performance.

Posted by: cokcontent

2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum