Jacobs to Replace Coker Heaters at BP Cherry Point

BP Cherry Point has let a contract to Jacobs Engineering Group for engineering, design, and procurement services for the replacement of the refinery’s two existing coker heaters.  The coker heaters were installed in 1970 as part of the original plant in Blaine, WA. The timeline and value of the contract have not been disclosed.

Oil & Gas Journal

Hydrocarbon Processing

Posted by: Becky Peterson

Becky is the Program/Website Content Coordinator and Registrar for RefComm. She enjoys travel, yoga, and high quality chocolate. (hint - hint)

2923 Topics 3878 Replies

Coking forum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur aliquam venenatis venenatis. Vestibulum tempus malesuada rhoncus.

Open forum